Upload Button Icon Add office photos

Filter interviews by

Jayanand Engineering Interview Questions and Answers for Freshers

Updated 8 Mar 2025

Jayanand Engineering Interview Experiences for Freshers

Popular Designations

3 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About Basic instruments
  • Q2. Pneumatic cylinder, RTD , TC, PLC

Instrument & Control Engineer Interview Questions asked at other Companies

Q1. what is power plant, how many types we can generate the power
View answer (3)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to run ash handling system
  • Ans. 

    Ash handling system is run by following proper procedures and guidelines to ensure safe and efficient operation.

    • Ensure proper maintenance of equipment

    • Regularly inspect and clean ash hoppers and conveyors

    • Train operators on safe handling and disposal of ash

    • Monitor ash quality and disposal methods

    • Follow environmental regulations and guidelines

    • Implement safety measures to prevent accidents

  • Answered by AI
  • Q2. How to line up vaccume pump
  • Ans. 

    To line up a vacuum pump, follow these steps.

    • Ensure the pump is properly mounted and secured.

    • Connect the pump to the system and turn it on.

    • Adjust the valves to achieve the desired vacuum level.

    • Monitor the pump and system for any issues or leaks.

    • Shut off the pump and disconnect it from the system when finished.

  • Answered by AI

Shift Incharge Interview Questions asked at other Companies

Q1. Tell me about power factor and how to keep always .80?
View answer (5)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024.

Round 1 - Telephonic Call 

(1 Question)

  • Q1. What do you know about Clinker Grinder
  • Ans. 

    A Clinker Grinder is a machine used in power plants to crush and grind clinker, preventing blockages in ash handling systems.

    • Clinker grinders are essential in coal-fired power plants to process ash and clinker.

    • They help in reducing the size of clinkers to facilitate easier handling and disposal.

    • Commonly used in conjunction with ash handling systems to prevent equipment damage.

    • Examples include the use of clinker grinder

  • Answered by AI

Field Operator Interview Questions asked at other Companies

Q1. Activities participate and assisting in plant Start-Up , Shutdown, troubleshooting and Emergency situations for efficient and normalization of plant Operations
View answer (1)

Interview questions from similar companies

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.

Round 2 - Technical 

(1 Question)

  • Q1. It was all basic accounting question.mostly related to 12th standard c v raman book Friendly interviewers
Round 3 - HR 

(1 Question)

  • Q1. 5 min telephonic call with recruiter

Interview Preparation Tips

Interview preparation tips for other job seekers - Get yourself prepared with basic accounting questions and be confident

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous Project experience. Execution plan, Job responsibility, Technical for Electrical SLD, Chiller SLD, Functional test for all MEP items.

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to give correct answer, What you have mentioned in your CV the same question will be raise from Technical Board...

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

Jayanand Engineering Interview FAQs

How many rounds are there in Jayanand Engineering interview for freshers?
Jayanand Engineering interview process for freshers usually has 1-2 rounds. The most common rounds in the Jayanand Engineering interview process for freshers are Technical, Resume Shortlist and Telephonic Call.
What are the top questions asked in Jayanand Engineering interview for freshers?

Some of the top questions asked at the Jayanand Engineering interview for freshers -

  1. What do you know about Clinker Grin...read more
  2. how to line up vaccume p...read more
  3. how to run ash handling sys...read more

Tell us how to improve this page.

Jayanand Engineering Interview Process for Freshers

based on 3 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 763 Interviews
Tata Projects Interview Questions
4.2
 • 457 Interviews
KEC International Interview Questions
4.0
 • 316 Interviews
Tata Technologies Interview Questions
3.6
 • 266 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
View all

Jayanand Engineering Reviews and Ratings

based on 35 reviews

3.7/5

Rating in categories

3.8

Skill development

3.4

Work-life balance

3.1

Salary

3.5

Job security

3.6

Company culture

3.4

Promotions

3.3

Work satisfaction

Explore 35 Reviews and Ratings
Desk Engineer
10 salaries
unlock blur

₹2.4 L/yr - ₹3.6 L/yr

PLC Engineer
7 salaries
unlock blur

₹1.9 L/yr - ₹4.8 L/yr

Shift Incharge
7 salaries
unlock blur

₹3.2 L/yr - ₹4 L/yr

Safety Officer
7 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Maintenance Engineer
5 salaries
unlock blur

₹3 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Jayanand Engineering with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview