i
Jabil Circuit India
Filter interviews by
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Top trending discussions
I appeared for an interview in Mar 2025, where I was asked the following questions.
QMS stands for Quality Management System, it is a set of policies, processes, and procedures required for planning and execution in the core business area of an organization.
QMS helps organizations to consistently meet customer requirements and enhance customer satisfaction.
It ensures that products and services meet quality standards and comply with regulations.
QMS helps in identifying areas for improvement and impleme...
posted on 6 Jan 2025
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
I appeared for an interview before Apr 2023.
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
Mental ability and GK
I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.
Energy auditing is the process of assessing energy usage in a building or facility to identify opportunities for energy efficiency improvements.
Identifying energy consumption patterns
Assessing energy efficiency of equipment and systems
Recommendations for energy saving measures
Cost-benefit analysis of proposed improvements
Energy meters used in utilities measure the amount of electricity consumed by a household or business.
Types of energy meters include electromechanical meters, electronic meters, and smart meters
Reading is taken by recording the numbers displayed on the meter, usually in kilowatt-hours
Meter specifications include accuracy class, voltage range, current range, and communication protocols
Examples of energy meter manufactur...
Case study questions for specific role
SDLC stands for Software Development Life Cycle, a process used by software development teams to design, develop, and test high-quality software.
SDLC is a structured process that consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables that must be completed before moving on to the next phase.
Examples of SDLC mode...
STLC stands for Software Testing Life Cycle, a process followed to ensure high-quality software development.
STLC is a systematic approach to testing software throughout its development cycle.
It consists of phases like requirement analysis, test planning, test design, test execution, and test closure.
Each phase has specific goals and deliverables to ensure the quality of the software.
For example, in the requirement anal...
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I appeared for an interview before Jul 2021.
based on 1 review
Rating in categories
Test Engineer
230
salaries
| ₹1.5 L/yr - ₹9.2 L/yr |
Quality Engineer
157
salaries
| ₹1.1 L/yr - ₹6.4 L/yr |
Manufacturing Engineer
90
salaries
| ₹1.8 L/yr - ₹9.2 L/yr |
Quality Inspector
83
salaries
| ₹1.2 L/yr - ₹4.3 L/yr |
Industrial Engineer
66
salaries
| ₹2.2 L/yr - ₹9.5 L/yr |
Dixon Technologies
ECIL
TE Connectivity
Wistron