5'S can be implemented in fabrication by organizing and optimizing the workspace.
Sort and remove unnecessary items from the workspace
Set in order the necessary items in a logical and efficient manner
Shine and clean the workspace regularly
Standardize the processes and procedures for maintaining the workspace
Sustain the improvements by continuously monitoring and improving the workspace
Example: Use shadow boards to organ...
Weld deposition can be calculated by multiplying the weld bead cross-sectional area by the length of the weld.
Measure the cross-sectional area of the weld bead
Measure the length of the weld
Multiply the cross-sectional area by the length of the weld to get the weld deposition
Weld deposition can be expressed in cubic inches or cubic millimeters
SMH can be calculated by dividing the total time taken to complete a task by the number of units produced.
SMH stands for Standard Minute Hour
It is used to measure the productivity of a worker or a machine
Formula: SMH = Total time taken to complete a task / Number of units produced
Example: If it takes 120 minutes to produce 100 units, then SMH = 1.2 minutes per unit
Top trending discussions
based on 2 reviews
Rating in categories
Assistant Manager
19
salaries
| ₹9.8 L/yr - ₹16.5 L/yr |
Production Engineer
18
salaries
| ₹5.2 L/yr - ₹8 L/yr |
Deputy Manager
14
salaries
| ₹13 L/yr - ₹19.1 L/yr |
Senior Engineer
13
salaries
| ₹7.5 L/yr - ₹11 L/yr |
Technician
8
salaries
| ₹2.7 L/yr - ₹4.8 L/yr |
Thermax Limited
BHEL
Larsen & Toubro Limited
Siemens