Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Indus Towers Team. If you also belong to the team, you can get access from here

Indus Towers Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Indus Towers Quality Audit Engineer Interview Questions and Answers

Updated 10 Aug 2024

Indus Towers Quality Audit Engineer Interview Experiences

2 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Aug 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. What is your job responsibility, how much can connect load with 25 KVA transformer?
  • Ans. 

    Job responsibility includes ensuring quality audits and connecting loads to transformers within specified limits.

    • Job responsibility involves conducting quality audits to ensure compliance with standards and regulations

    • Connecting loads to a 25 KVA transformer requires knowledge of electrical systems and safety protocols

    • The maximum load that can be connected to a 25 KVA transformer is typically 25,000 watts or 25 kilowat...

  • Answered by AI
  • Q2. About Li Battery & SPD, VRLA battery, measuring voltages..

Quality Audit Engineer Interview Questions & Answers

user image Alamin Khandakar

posted on 4 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to find cement quantity from concrete ?
  • Ans. 

    To find cement quantity from concrete, calculate the volume of concrete and multiply it by the ratio of cement to concrete.

    • Calculate the volume of concrete by multiplying the length, width, and height of the concrete structure.

    • Determine the ratio of cement to concrete. This ratio is usually specified in the construction plans or specifications.

    • Multiply the volume of concrete by the ratio of cement to concrete to find t...

  • Answered by AI

Quality Audit Engineer Interview Questions Asked at Other Companies

Q1. What is your job responsibility, how much can connect load with 2 ... read more
Q2. How to find cement quantity from concrete ?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is EFL. What is OFC
  • Ans. 

    EFL stands for English as a Foreign Language. OFC stands for Optical Fiber Cable.

    • EFL refers to the teaching or learning of English in a non-English speaking country.

    • OFC is a type of cable made of thin strands of glass or plastic that transmit data using light.

    • OFC is commonly used for high-speed internet and telecommunications.

    • EFL is often taught in language schools or universities to non-native speakers.

    • EFL teachers ma...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Job package Requirements

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare for OFC process realeted questions and about it.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About your project mentioned in resume
  • Q2. Basic sdet questions

Interview Preparation Tips

Interview preparation tips for other job seekers - All the best
Speak fluently, written and communication is more important
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What about your self
  • Q2. What is your work place

Interview Questionnaire 

1 Question

  • Q1. What is quality assurance? Explain 7Qc tool etc
  • Ans. 

    Quality assurance is the process of ensuring that a product or service meets the desired level of quality.

    • 7QC tools are used to identify and solve quality problems

    • The tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet

    • QA involves creating and implementing processes and procedures to prevent defects and improve quality

    • It also involves testing and ev...

  • Answered by AI

I applied via Approached by Company and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Water Division related on question with planning and billing. They enquiry related to project deep and deep and asking about the fix the issue.
  • Q2. Filter house methodology and construction related.

Interview Preparation Tips

Interview preparation tips for other job seekers - If they need hire you otherwise they egnor you after round of round interview happen.
One step HR and then 2-3step of technical round related to current project.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Job profile technical questions discussion
Round 3 - Group Discussion 

Multiple questions for technical rounds

Round 4 - HR 

(1 Question)

  • Q1. Finely HR discussion salery and joining process
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Project monitoring
  • Q2. Project handling
Round 2 - One-on-one 

(1 Question)

  • Q1. Project completion
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. All quality related question
Round 2 - HR 

(1 Question)

  • Q1. Salary related question

Indus Towers Interview FAQs

How many rounds are there in Indus Towers Quality Audit Engineer interview?
Indus Towers interview process usually has 1 rounds. The most common rounds in the Indus Towers interview process are Technical.
How to prepare for Indus Towers Quality Audit Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Indus Towers. The most common topics and skills that interviewers at Indus Towers expect are Quality Audit, Civil Engineering, Auditing, Quality Check and Report Preparation.
What are the top questions asked in Indus Towers Quality Audit Engineer interview?

Some of the top questions asked at the Indus Towers Quality Audit Engineer interview -

  1. What is your job responsibility, how much can connect load with 25 KVA transfor...read more
  2. How to find cement quantity from concret...read more
  3. About Li Battery & SPD, VRLA battery, measuring voltage...read more

Tell us how to improve this page.

Indus Towers Quality Audit Engineer Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Cisco Interview Questions
4.2
 • 374 Interviews
Nvidia Interview Questions
3.7
 • 107 Interviews
BT Business Interview Questions
4.0
 • 81 Interviews
Tejas Networks Interview Questions
4.0
 • 76 Interviews
Arista Networks Interview Questions
4.2
 • 43 Interviews
Redington Interview Questions
4.0
 • 34 Interviews
View all
Indus Towers Quality Audit Engineer Salary
based on 36 salaries
₹3.5 L/yr - ₹5.6 L/yr
At par with the average Quality Audit Engineer Salary in India
View more details

Indus Towers Quality Audit Engineer Reviews and Ratings

based on 11 reviews

3.1/5

Rating in categories

3.5

Skill development

3.3

Work-life balance

3.7

Salary

3.3

Job security

3.8

Company culture

3.5

Promotions

3.2

Work satisfaction

Explore 11 Reviews and Ratings
Assistant Manager
330 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

MIS Executive
316 salaries
unlock blur

₹1.6 L/yr - ₹5 L/yr

Manager
260 salaries
unlock blur

₹11.3 L/yr - ₹26 L/yr

Field Support Engineer
225 salaries
unlock blur

₹3.2 L/yr - ₹7.2 L/yr

Senior Executive
214 salaries
unlock blur

₹1.9 L/yr - ₹10.6 L/yr

Explore more salaries
Compare Indus Towers with

Sterlite Technologies

3.8
Compare

Cisco

4.2
Compare

BT Business

4.0
Compare

Lumen Technologies

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview