i
Indus Towers
Filter interviews by
Clear (1)
Lease grants exclusive possession of property for a fixed term, while license grants permission to use property for a specific purpose.
Lease involves transfer of interest in property, while license does not
Lease typically requires payment of rent, while license may or may not involve payment
Lease provides more rights and protections to the tenant, while license is more limited in scope
Lease is usually for a longer term...
Major terms and conditions in a contract include parties involved, consideration, offer and acceptance, legal purpose, and mutual agreement.
Parties involved: Clearly identify the parties entering into the contract.
Consideration: Both parties must exchange something of value, such as money, goods, or services.
Offer and acceptance: One party must make an offer and the other party must accept it.
Legal purpose: The contrac...
Top trending discussions
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Uptime in onm refers to the amount of time a system or service is operational and available for use.
Uptime is typically measured as a percentage of total time, with 100% uptime indicating continuous availability.
Factors affecting uptime include maintenance schedules, system reliability, and response to downtime incidents.
For example, a system with 99.9% uptime would be operational for 99.9% of the total time period.
Mon...
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
Legal work discussion
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Tells about you..
Technical questions.
I applied via Company Website and was interviewed before Nov 2021. There were 4 interview rounds.
He give me a problem,
And tell fix it.
They again give me a case,
And asks for a solution.
posted on 21 Sep 2024
Work related Discussion and working experience abour working
Switched Mode Power Supply
SMPS stands for Switched Mode Power Supply
It is a type of power supply that uses switching devices to convert electrical power efficiently
Commonly used in electronic devices such as computers, TVs, and smartphones
An Ex-OR gate (or Ex-NOR gate) can be implemented using op-amps.
An Ex-OR gate can be implemented using two op-amps and a few resistors.
The op-amps are configured as comparators with positive feedback.
The output of the Ex-OR gate is high when the inputs are different.
The output of the Ex-NOR gate is high when the inputs are the same.
Example circuit: https://www.electronics-tutorials.ws/wp-content/uploads/2018/05/ex-or-g
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
332
salaries
| ₹0 L/yr - ₹0 L/yr |
MIS Executive
324
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
235
salaries
| ₹0 L/yr - ₹0 L/yr |
Field Support Engineer
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
197
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharti Infratel
American Tower Corporation
GTL Infrastructure
TowerVision India