Filter interviews by
I applied via Campus Placement and was interviewed in Nov 2023. There were 4 interview rounds.
General aptitude test which is elimination round
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are commonly used in power distribution systems to step up or step down voltage levels.
They consist of two or more coils of wire, known as windings, that are wound around a core made of magnetic material.
The primary winding is connected to the input voltage source, while the...
I applied via Naukri.com and was interviewed before Mar 2021. There were 4 interview rounds.
Technical questions related to domain.
Carbonation is the process of dissolving carbon dioxide gas in a liquid.
Occurs naturally in carbonated mineral water
Used in the production of carbonated beverages
Can affect the pH of a liquid
Can cause corrosion in concrete structures
Pratical test by Auto level.
I appeared for an interview in Jul 2020.
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
Maintenance problems and solutions
Equipment breakdowns - regular maintenance checks and repairs
Lack of spare parts - inventory management and ordering in advance
Inefficient processes - process optimization and automation
Safety hazards - regular safety inspections and training
Environmental concerns - proper disposal of hazardous waste
Budget constraints - prioritization and cost-effective solutions
I applied via Recruitment Consultant and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2022. There were 5 interview rounds.
Jombay test only aptitude test
I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.
The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.
The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.
The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.
Proper alignment and leveling of the mill components are crucial for efficient operation.
Electrical and me...
The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.
Planning and preparation
Site preparation and foundation
Assembly of structural components
Installation of utilities and systems
Finishing and testing
Final inspection and handover
Planning of the erection involves creating a detailed plan for the construction process.
Identify the scope and objectives of the project
Determine the sequence of activities and their dependencies
Allocate resources and manpower
Create a schedule and timeline
Consider safety measures and risk management
Coordinate with other teams and stakeholders
Monitor progress and make adjustments as necessary
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Assistant Manager
118
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Area Relationship Manager
100
salaries
| ₹4.4 L/yr - ₹11.2 L/yr |
Senior Engineer
96
salaries
| ₹4.2 L/yr - ₹8.8 L/yr |
Senior Assistant Manager
69
salaries
| ₹8 L/yr - ₹14.4 L/yr |
Sales Officer
63
salaries
| ₹2 L/yr - ₹8.8 L/yr |
JK Cement
ACC
Ambuja Cements
Nuvoco Vistas