i
Hyundai Motor India Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
The pre drill for tap should be selected based on the material being drilled and the size of the tap.
Consider the material being drilled: Different materials require different pre drill sizes. So, it is important to know the material before selecting the pre drill.
Refer to tap drill charts: Tap drill charts provide recommended pre drill sizes for different tap sizes and materials. These charts can be found in machining...
Controlling roughness in grinding involves adjusting parameters, using proper grinding techniques, and maintaining the grinding machine.
Adjust grinding parameters such as speed, feed rate, and depth of cut to achieve desired roughness.
Use the appropriate grinding wheel with the right grit size and hardness for the material being ground.
Ensure the grinding machine is properly maintained and in good condition.
Apply coola...
CPC of cutting tools can be controlled through proper selection of tool material, coatings, cutting parameters, and tool maintenance.
Selecting the right tool material based on the workpiece material and cutting conditions
Applying appropriate coatings to reduce friction and wear
Optimizing cutting parameters such as cutting speed, feed rate, and depth of cut
Regularly inspecting and maintaining the cutting tools to ensure...
The runout allowance of a reamer and drill refers to the acceptable amount of deviation from perfect alignment during operation.
Runout allowance is a measure of how much the cutting edge of the tool can deviate from the desired path.
It is important to have a small runout allowance to ensure accurate and precise machining.
The runout allowance can vary depending on the specific application and the tolerance requirements.
...
I maintain the inventory by implementing a systematic approach that includes regular audits, accurate record-keeping, and efficient replenishment strategies.
Conduct regular audits to ensure accuracy and identify any discrepancies or shortages.
Maintain accurate records of inventory levels, including item descriptions, quantities, and locations.
Implement efficient replenishment strategies based on demand forecasting and ...
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Dec 2019. There was 1 interview round.
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes consistent processes and procedures.
Su...
Pokayoke is a Japanese term for mistake-proofing or error-proofing.
It is a quality control technique used to prevent errors or defects in a product or process.
It involves designing a process or product in a way that makes it impossible or difficult to make mistakes.
Examples include using color-coding, checklists, and sensors to prevent errors.
Pokayoke helps improve product quality, reduce waste, and increase efficiency
Kaizen is a Japanese term for continuous improvement.
Kaizen involves making small, incremental changes to improve processes and systems.
It is a philosophy that emphasizes the importance of ongoing improvement in all aspects of an organization.
Kaizen can be applied to any area of an organization, from manufacturing to customer service.
Examples of kaizen include implementing a new process to reduce waste, improving commu...
I applied via Recruitment Consultant and was interviewed in Jan 2018. There were 6 interview rounds.
posted on 16 May 2020
I applied via Walk-in and was interviewed before May 2019. There was 1 interview round.
The 5 engine part names are piston, cylinder, crankshaft, camshaft, and valve.
Piston: Moves up and down inside the cylinder to compress the fuel-air mixture.
Cylinder: Houses the piston and allows for the combustion process.
Crankshaft: Converts the linear motion of the piston into rotational motion.
Camshaft: Controls the opening and closing of the engine's valves.
Valve: Regulates the flow of fuel-air mixture and exhaust
1st and 3rd angle methods are used in engineering drawings to represent the orientation of an object in 3D space.
1st angle method is commonly used in Europe and Asia, while 3rd angle method is used in North America.
In 1st angle method, the object is placed in the first quadrant of the viewing plane, while in 3rd angle method, it is placed in the third quadrant.
The symbol for 1st angle projection is a square with a dot ...
posted on 19 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There was 1 interview round.
posted on 17 Oct 2017
I appeared for an interview before Oct 2016.
I am passionate about ensuring quality standards are met and enjoy problem-solving in a technical environment.
Passionate about quality assurance
Enjoy problem-solving in technical environments
Excited about contributing to the success of the company
I applied via Company Website and was interviewed before Jun 2019. There was 1 interview round.
based on 1 interview
Interview experience
Manager
587
salaries
| ₹8.1 L/yr - ₹27 L/yr |
Assistant Manager
565
salaries
| ₹7 L/yr - ₹20 L/yr |
Trainee
423
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Diploma Mechanical Engineer
306
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Hyundai Diploma Trainee
255
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Mahindra & Mahindra
Ashok Leyland
Hero MotoCorp
TVS Motor