I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
SIMOPS stands for simultaneous operations. It refers to the situation where multiple activities are being carried out in the same area at the same time.
Ensure proper communication and coordination between different teams involved in the operations
Implement strict safety measures to prevent any potential hazards or accidents
Establish clear boundaries and work zones for each activity to avoid interference
Regularly monito...
Top trending discussions
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 22 Feb 2022
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Civil Engineer
13
salaries
| ₹6.8 L/yr - ₹27 L/yr |
Safety Officer
10
salaries
| ₹1.2 L/yr - ₹5.1 L/yr |
Civil Site Engineer
8
salaries
| ₹7.9 L/yr - ₹18.9 L/yr |
Electrical Engineer
8
salaries
| ₹11 L/yr - ₹20.4 L/yr |
Piping Supervisor
7
salaries
| ₹8.7 L/yr - ₹30.5 L/yr |
AECOM
AtkinsRealis
Saipem
Nasser S. Al Hajri Corporation