Add office photos
Employer?
Claim Account for FREE

HERO ECOTECH

3.8
based on 90 Reviews
Filter interviews by

10+ Shubham Housing Development Finance Interview Questions and Answers

Updated 5 Feb 2024

Q1. What kind of defects arises during product assembly

Ans.

Defects during product assembly can be of various types

  • Missing parts or components

  • Incorrectly installed parts

  • Misaligned parts

  • Loose or over-tightened fasteners

  • Scratches or dents on the product

  • Electrical or wiring issues

  • Inconsistent product quality

  • Incomplete assembly

  • Poorly finished surfaces

Add your answer

Q2. What is lean manufacturing,explain with it's tool

Ans.

Lean manufacturing is a systematic approach to minimize waste and maximize value in production processes.

  • It focuses on continuous improvement and elimination of non-value adding activities.

  • Tools include 5S, Kanban, Value Stream Mapping, and Just-in-Time production.

  • It aims to increase efficiency, reduce lead times, and improve quality.

  • Examples of lean manufacturing implementation include Toyota Production System and Lean Six Sigma.

Add your answer

Q3. What is productivity of my assembly lines

Ans.

The productivity of the assembly lines depends on various factors such as equipment, labor, and process efficiency.

  • Productivity can be measured by the number of units produced per hour or day.

  • Efficient use of equipment and labor can increase productivity.

  • Process improvements such as reducing downtime and optimizing workflows can also boost productivity.

  • Regular monitoring and analysis of productivity metrics can help identify areas for improvement.

  • Benchmarking against industry...read more

Add your answer

Q4. What is TPM,How many pillers are in TPM

Ans.

TPM stands for Total Productive Maintenance. It is a maintenance strategy that aims to maximize equipment effectiveness and minimize downtime.

  • TPM involves all employees in the maintenance process

  • It focuses on proactive maintenance to prevent breakdowns

  • There are 8 pillars of TPM, including autonomous maintenance, planned maintenance, and quality maintenance

  • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and increasing producti...read more

Add your answer
Discover Shubham Housing Development Finance interview dos and don'ts from real experiences

Q5. What is OEE,how to calculate OEE

Ans.

OEE stands for Overall Equipment Effectiveness. It is a measure of manufacturing productivity.

  • OEE is calculated by multiplying Availability, Performance, and Quality.

  • Availability is the percentage of time the equipment is available for production.

  • Performance is the percentage of the maximum speed the equipment is running.

  • Quality is the percentage of good quality products produced.

  • OEE = Availability x Performance x Quality

  • A perfect OEE score is 100%.

  • OEE can be used to identify...read more

Add your answer

Q6. How I control non conconfirmity

Ans.

I control non-conformity by implementing a quality management system and conducting regular audits.

  • Implementing a quality management system to ensure all processes are standardized and documented

  • Conducting regular audits to identify non-conformities and take corrective actions

  • Training employees on quality standards and procedures to prevent non-conformities

  • Establishing a system for reporting and investigating non-conformities

  • Taking corrective actions to prevent recurrence of ...read more

Add your answer
Are these interview questions helpful?

Q7. How to reduce manpower cost

Ans.

Reducing manpower cost can be achieved through automation, process optimization, and outsourcing.

  • Automate repetitive tasks to reduce the need for manual labor

  • Optimize production processes to eliminate inefficiencies and reduce waste

  • Consider outsourcing non-core functions to reduce the size of the workforce

  • Implement training programs to improve employee skills and productivity

  • Use technology to monitor and manage employee performance

  • Offer incentives for employees who suggest co...read more

Add your answer

Q8. How manage union manpower

Ans.

Managing union manpower requires effective communication, negotiation, and adherence to labor laws.

  • Establish open communication channels with union representatives

  • Negotiate fair and reasonable terms for wages, benefits, and working conditions

  • Ensure compliance with labor laws and collective bargaining agreements

  • Resolve disputes and grievances through mediation and arbitration

  • Maintain positive relationships with union members to promote productivity and job satisfaction

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. How to manage WIP

Ans.

WIP can be managed by setting clear priorities, monitoring progress, and adjusting schedules as needed.

  • Establish clear priorities for each project

  • Monitor progress regularly to identify potential delays

  • Adjust schedules as needed to ensure timely completion

  • Communicate with team members to ensure everyone is on the same page

  • Use tools such as Kanban boards or Gantt charts to visualize progress

Add your answer

Q10. What will be the goal in jobs

Ans.

The goal in jobs is to ensure efficient and effective assembly operations while maintaining high quality standards.

  • To optimize production processes and minimize waste

  • To ensure timely delivery of products to customers

  • To maintain a safe and clean work environment

  • To continuously improve assembly processes and procedures

  • To train and develop employees to enhance their skills and knowledge

  • To meet or exceed production targets while maintaining high quality standards

Add your answer

Q11. How to save company cost

Ans.

To save company cost, focus on optimizing processes, reducing waste, and leveraging technology.

  • Streamline operations and eliminate inefficiencies

  • Implement cost-saving measures such as energy conservation and waste reduction

  • Leverage technology to automate tasks and improve productivity

  • Negotiate better deals with suppliers and vendors

  • Encourage remote work and flexible schedules to reduce office space and overhead costs

View 1 answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Shubham Housing Development Finance

based on 6 interviews
Interview experience
4.2
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 417 Interview Questions
3.3
 • 401 Interview Questions
4.2
 • 365 Interview Questions
4.2
 • 208 Interview Questions
3.6
 • 156 Interview Questions
4.3
 • 135 Interview Questions
View all
Top HERO ECOTECH Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter