I applied via Campus Placement and was interviewed in May 2021. There were 3 interview rounds.
Top trending discussions
posted on 6 Feb 2024
I applied via Campus Placement and was interviewed in Aug 2023. There was 1 interview round.
Pumps are devices that use mechanical action to move fluids from one place to another.
Pumps work by creating a pressure difference to push fluids through a system.
They typically consist of an inlet, an outlet, and an impeller or rotor.
The impeller rotates, creating centrifugal force that pushes the fluid outwards.
Positive displacement pumps use reciprocating or rotary motion to move fluid in discrete volumes.
Examples o...
A stress-strain graph shows the relationship between stress and strain in a material.
The graph typically has stress on the y-axis and strain on the x-axis.
It starts with a linear elastic region where stress is directly proportional to strain.
Beyond the elastic limit, the material enters the plastic region where permanent deformation occurs.
The graph may show a yield point, ultimate tensile strength, and fracture point.
...
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2023. There was 1 interview round.
Dealing with liquid measurement involves understanding units, using appropriate tools, and considering factors like temperature and viscosity.
Understand different units of liquid measurement, such as liters, milliliters, gallons, and fluid ounces.
Use appropriate tools like measuring cups, graduated cylinders, or pipettes to accurately measure liquids.
Consider factors like temperature and viscosity, as they can affect t...
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 3 interview rounds.
I am not currently working with a boiler.
I do not have experience with boilers.
I am willing to learn and adapt to new systems.
If there is a specific type of boiler required for the job, I am open to training and gaining experience with it.
Our plant process has a capacity of 500 units per day.
Our plant process is designed to handle up to 500 units per day.
We have optimized our production line to achieve a maximum capacity of 500 units per day.
Our current production rate is at 80% of our plant process capacity.
We are constantly looking for ways to improve our plant process to increase capacity.
CFBC boiler problems can include ash buildup, erosion, and corrosion.
Regular cleaning and maintenance can prevent ash buildup
Using high-quality refractory materials can prevent erosion
Using corrosion-resistant materials can prevent corrosion
Monitoring and controlling the temperature and pressure can prevent other issues
Consulting with experts and following manufacturer guidelines can help address any problems
I applied via Campus Placement and was interviewed before Mar 2023. There were 2 interview rounds.
General knowledge questions asked in test
Current affairs discussed in GD round
I was interviewed before Apr 2022.
Math, reasoning ,Quant, technical, behaviour
Situational Group discussion
posted on 28 May 2023
I applied via Walk-in
posted on 5 Sep 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
Senior Officer
64
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Graphite India
PCBL Chemical Limited
Rain Industries
Gujarat Narmada Valley Fertilizers & Chemicals