Filter interviews by
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
posted on 25 Dec 2021
I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.
My future plans include advancing my skills and knowledge in production management, taking on more responsibilities, and eventually moving into a higher leadership role.
Continuing to learn and stay updated on the latest production techniques and technologies
Seeking opportunities for professional development and training
Taking on additional responsibilities and challenges to further develop my leadership skills
Working t...
The key components required for building a product include design, materials, manufacturing processes, quality control, and packaging.
Design: A well-thought-out design is essential for creating a functional and aesthetically pleasing product.
Materials: The selection of appropriate materials is crucial for the product's performance, durability, and cost-effectiveness.
Manufacturing processes: The production supervisor mu...
Seeking new opportunities for growth and advancement.
Looking for a new challenge
Seeking career progression
Wanting to broaden my skillset
Exploring new industries or sectors
Relocating to a different area
Company downsizing or restructuring
Yes, a lathe machine consists of several parts that work together to shape and cut materials.
The bed: the base of the machine that supports all the other components
The headstock: holds the spindle and chuck, which rotate the workpiece
The tailstock: supports the other end of the workpiece and can be adjusted for length
The carriage: moves along the bed and holds the cutting tool
The cutting tool: removes material from the...
posted on 15 Jan 2021
I applied via Company Website and was interviewed in Dec 2020. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.
I have 5 years of experience in production engineering.
I have worked in the production engineering field for 5 years.
My experience includes optimizing production processes and improving efficiency.
I have successfully implemented cost-saving measures in previous roles.
I have a strong understanding of manufacturing principles and technologies.
I have experience working with cross-functional teams to achieve production goa
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear organizational structure and job roles
Communicate effectively with the team to ensure understanding of goals and expectations
Provide necessary training and resources for skill development
Motivate and reward employees for their hard work and achievements
Regularly evaluate performance and provide feedback for i
Salary expectations are based on industry standards, experience, and location.
Research industry standards for Production Engineers in your area
Consider your level of experience and skills
Factor in the cost of living in the location of the job
Be prepared to negotiate based on benefits and perks offered
Provide a range rather than a specific number
posted on 11 Mar 2024
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality metrics.
OEE stands for Overall Equipment Effectiveness
It is calculated by multiplying availability, performance, and quality percentages
OEE helps identify areas for improvement in manufacturing processes
Example: If a machine has 90% availability, 95% performance, and 98% quality, its OEE would be 83.79%
OEE is...
Poka yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.
Poka yoke is a Japanese term meaning 'mistake-proofing' or 'error-proofing'. It involves designing a process or system in a way that prevents mistakes or errors from occurring.
Poka yoke techniques can include using sensors, alarms, or physical devices to detect and prevent errors.
For example, a poka ...
Production is the process of creating goods or services, while productivity is the measure of efficiency in producing those goods or services.
Production refers to the creation of goods or services, while productivity measures the efficiency of that production.
Production is a process, while productivity is a measure.
Production can be increased by adding more resources, while productivity can be increased by improving pr...
TPM stands for Total Productive Maintenance and JH stands for Job Hazard Analysis. JH 7 steps are the steps involved in conducting a JH analysis.
TPM is a maintenance strategy aimed at maximizing the productivity of equipment and minimizing downtime.
JH is a safety analysis technique used to identify potential hazards in a job or task.
JH 7 steps involve breaking down a job into steps, identifying potential hazards, deter...
Check sheet is a tool used to collect and analyze data. WSQC, SWC, and WES are not commonly used acronyms in relation to production engineering.
Check sheet is a simple data collection tool used to track defects or issues in a process
WSQC, SWC, and WES are not commonly used acronyms in production engineering
However, there are similar tools like the 5S methodology or the DMAIC process for continuous improvement
7QC tools check sheet is a document used to collect and analyze data, while Pareto diagram is a graphical representation of the data.
7QC tools check sheet is used to identify and solve problems in production processes
It helps in collecting and analyzing data related to the process
Pareto diagram is a bar graph that shows the relative frequency or size of problems in descending order of importance
It helps in identifying ...
Rejection handling is the process of identifying and addressing rejected products. Red bin analysis is a method of analyzing rejected products to determine the cause of rejection.
Rejection handling involves identifying and segregating rejected products
Red bin analysis involves analyzing rejected products to determine the root cause of rejection
The data collected during red bin analysis can be used to improve production...
Manpower handling refers to managing and organizing the workforce in a production environment.
It involves recruiting, training, and scheduling employees
Ensuring safety and compliance with regulations
Motivating and supervising workers
Optimizing productivity and efficiency
Dealing with conflicts and resolving issues
Examples include managing a production line, overseeing a team of technicians, or coordinating shifts in a f
Kaizen is a Japanese term for continuous improvement while CAPA stands for Corrective and Preventive Action.
Kaizen involves making small, incremental improvements to processes and systems over time.
CAPA is a process used to identify and address the root cause of a problem or nonconformity.
Kaizen and CAPA are both important tools for improving quality and efficiency in manufacturing and other industries.
Examples of kaiz...
Efficiency in production engineering refers to the ratio of output to input.
Efficiency is a measure of how well resources are utilized in the production process.
It is calculated as the ratio of output to input.
Higher efficiency means more output is produced with the same amount of input.
Efficiency can be improved by optimizing processes, reducing waste, and increasing automation.
For example, reducing the time it takes ...
4m changing formats refers to the process of changing the format of a production line from one product to another.
It involves reconfiguring the machinery and equipment to accommodate the new product
It may require changing the packaging, labeling, and other materials used in the production process
It is a common practice in manufacturing to increase efficiency and flexibility
Example: Changing a production line from makin
KPI instruction refers to the guidelines or rules that define how key performance indicators (KPIs) should be measured and reported.
KPI instruction provides a framework for measuring and reporting KPIs consistently and accurately.
It outlines the specific metrics that should be tracked and how they should be calculated.
KPI instruction also includes guidelines for setting targets and benchmarks for KPIs.
Examples of KPI i...
ISO-TS audit is a quality management system audit for automotive industry.
ISO-TS audit is a quality management system audit for automotive industry
It is based on ISO 9001 standard and specific requirements for automotive industry
It focuses on ensuring product quality, safety, and customer satisfaction
It involves auditing the entire production process from design to delivery
Examples of ISO-TS audit include audits of car
Line and machining processing are methods used in manufacturing to produce products efficiently and accurately.
Line processing involves a series of steps in which a product is assembled or produced in a linear fashion.
Machining processing involves the use of machines to shape and cut materials into specific shapes and sizes.
Both methods are used to increase efficiency and accuracy in manufacturing processes.
Examples of...
Quality Controller
3
salaries
| ₹5.3 L/yr - ₹7 L/yr |
General Accountant
3
salaries
| ₹3.2 L/yr - ₹3.2 L/yr |
Dhoot Transmission
ZF Steering Gear
Amphenol Interconnect
Ag Industries