Upload Button Icon Add office photos

Filter interviews by

GYMA Food Industries Production Supervisor Interview Questions and Answers

Updated 12 Dec 2023

GYMA Food Industries Production Supervisor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About candidate , pay benefits
Round 3 - Technical 

(1 Question)

  • Q1. Related to production

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Production department
  • Q2. Production supervisor
  • Q3. Hr solutions management
  • Q4. Manager solutions
  • Q5. Gm head of the department

Interview Preparation Tips

Interview preparation tips for other job seekers - Production department
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Blow moulding process
Round 3 - HR 

(1 Question)

  • Q1. Hame only blow molding Jana hai

Interview Preparation Tips

Interview preparation tips for other job seekers - 5s, kaizan, TPM ,mold lod, process

I applied via Walk-in and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What are your future plans
  • Ans. 

    My future plans include advancing my skills and knowledge in production management, taking on more responsibilities, and eventually moving into a higher leadership role.

    • Continuing to learn and stay updated on the latest production techniques and technologies

    • Seeking opportunities for professional development and training

    • Taking on additional responsibilities and challenges to further develop my leadership skills

    • Working t...

  • Answered by AI
  • Q2. What are the key components required for building a product
  • Ans. 

    The key components required for building a product include design, materials, manufacturing processes, quality control, and packaging.

    • Design: A well-thought-out design is essential for creating a functional and aesthetically pleasing product.

    • Materials: The selection of appropriate materials is crucial for the product's performance, durability, and cost-effectiveness.

    • Manufacturing processes: The production supervisor mu...

  • Answered by AI
  • Q3. What is the reason for leaving previous organisation
  • Ans. 

    Seeking new opportunities for growth and advancement.

    • Looking for a new challenge

    • Seeking career progression

    • Wanting to broaden my skillset

    • Exploring new industries or sectors

    • Relocating to a different area

    • Company downsizing or restructuring

  • Answered by AI
  • Q4. Do you know about the parts of a lathe machine
  • Ans. 

    Yes, a lathe machine consists of several parts that work together to shape and cut materials.

    • The bed: the base of the machine that supports all the other components

    • The headstock: holds the spindle and chuck, which rotate the workpiece

    • The tailstock: supports the other end of the workpiece and can be adjusted for length

    • The carriage: moves along the bed and holds the cutting tool

    • The cutting tool: removes material from the...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answer the questions as per your knowledge

I applied via Company Website and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Programing

Interview Preparation Tips

Interview preparation tips for other job seekers - 5/2/21

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. My work experience, included machine type.
  • Q2. How many year of experience.
  • Ans. 

    I have 5 years of experience in production engineering.

    • I have worked in the production engineering field for 5 years.

    • My experience includes optimizing production processes and improving efficiency.

    • I have successfully implemented cost-saving measures in previous roles.

    • I have a strong understanding of manufacturing principles and technologies.

    • I have experience working with cross-functional teams to achieve production goa

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Question regarding machine shop.
  • Q2. CNC & VMC programming.
Round 3 - HR 

(2 Questions)

  • Q1. How to handle the manpower .
  • Ans. 

    Manpower can be effectively handled by proper planning, communication, training, and motivation.

    • Develop a clear organizational structure and job roles

    • Communicate effectively with the team to ensure understanding of goals and expectations

    • Provide necessary training and resources for skill development

    • Motivate and reward employees for their hard work and achievements

    • Regularly evaluate performance and provide feedback for i

  • Answered by AI
  • Q2. Expectation of salary amount.
  • Ans. 

    Salary expectations are based on industry standards, experience, and location.

    • Research industry standards for Production Engineers in your area

    • Consider your level of experience and skills

    • Factor in the cost of living in the location of the job

    • Be prepared to negotiate based on benefits and perks offered

    • Provide a range rather than a specific number

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tum kya kam kar lete ho
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell about job roles

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About injection molding

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(14 Questions)

  • Q1. What Is oee calculation
  • Ans. 

    OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality metrics.

    • OEE stands for Overall Equipment Effectiveness

    • It is calculated by multiplying availability, performance, and quality percentages

    • OEE helps identify areas for improvement in manufacturing processes

    • Example: If a machine has 90% availability, 95% performance, and 98% quality, its OEE would be 83.79%

    • OEE is...

  • Answered by AI
  • Q2. What is poka yoka and capa
  • Ans. 

    Poka yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.

    • Poka yoke is a Japanese term meaning 'mistake-proofing' or 'error-proofing'. It involves designing a process or system in a way that prevents mistakes or errors from occurring.

    • Poka yoke techniques can include using sensors, alarms, or physical devices to detect and prevent errors.

    • For example, a poka ...

  • Answered by AI
  • Q3. What is difference production and productivity
  • Ans. 

    Production is the process of creating goods or services, while productivity is the measure of efficiency in producing those goods or services.

    • Production refers to the creation of goods or services, while productivity measures the efficiency of that production.

    • Production is a process, while productivity is a measure.

    • Production can be increased by adding more resources, while productivity can be increased by improving pr...

  • Answered by AI
  • Q4. What is tpm and jh and jh 7 steps
  • Ans. 

    TPM stands for Total Productive Maintenance and JH stands for Job Hazard Analysis. JH 7 steps are the steps involved in conducting a JH analysis.

    • TPM is a maintenance strategy aimed at maximizing the productivity of equipment and minimizing downtime.

    • JH is a safety analysis technique used to identify potential hazards in a job or task.

    • JH 7 steps involve breaking down a job into steps, identifying potential hazards, deter...

  • Answered by AI
  • Q5. What is check sheet and wsqc,swc,wes
  • Ans. 

    Check sheet is a tool used to collect and analyze data. WSQC, SWC, and WES are not commonly used acronyms in relation to production engineering.

    • Check sheet is a simple data collection tool used to track defects or issues in a process

    • WSQC, SWC, and WES are not commonly used acronyms in production engineering

    • However, there are similar tools like the 5S methodology or the DMAIC process for continuous improvement

  • Answered by AI
  • Q6. What is 7Qc tools check sheet and parato digram
  • Ans. 

    7QC tools check sheet is a document used to collect and analyze data, while Pareto diagram is a graphical representation of the data.

    • 7QC tools check sheet is used to identify and solve problems in production processes

    • It helps in collecting and analyzing data related to the process

    • Pareto diagram is a bar graph that shows the relative frequency or size of problems in descending order of importance

    • It helps in identifying ...

  • Answered by AI
  • Q7. What is rejection handling and red bin analysis
  • Ans. 

    Rejection handling is the process of identifying and addressing rejected products. Red bin analysis is a method of analyzing rejected products to determine the cause of rejection.

    • Rejection handling involves identifying and segregating rejected products

    • Red bin analysis involves analyzing rejected products to determine the root cause of rejection

    • The data collected during red bin analysis can be used to improve production...

  • Answered by AI
  • Q8. What do you man power handling
  • Ans. 

    Manpower handling refers to managing and organizing the workforce in a production environment.

    • It involves recruiting, training, and scheduling employees

    • Ensuring safety and compliance with regulations

    • Motivating and supervising workers

    • Optimizing productivity and efficiency

    • Dealing with conflicts and resolving issues

    • Examples include managing a production line, overseeing a team of technicians, or coordinating shifts in a f

  • Answered by AI
  • Q9. What is kaizen and capa
  • Ans. 

    Kaizen is a Japanese term for continuous improvement while CAPA stands for Corrective and Preventive Action.

    • Kaizen involves making small, incremental improvements to processes and systems over time.

    • CAPA is a process used to identify and address the root cause of a problem or nonconformity.

    • Kaizen and CAPA are both important tools for improving quality and efficiency in manufacturing and other industries.

    • Examples of kaiz...

  • Answered by AI
  • Q10. What is efficiency in your line
  • Ans. 

    Efficiency in production engineering refers to the ratio of output to input.

    • Efficiency is a measure of how well resources are utilized in the production process.

    • It is calculated as the ratio of output to input.

    • Higher efficiency means more output is produced with the same amount of input.

    • Efficiency can be improved by optimizing processes, reducing waste, and increasing automation.

    • For example, reducing the time it takes ...

  • Answered by AI
  • Q11. What is 4m changing formats
  • Ans. 

    4m changing formats refers to the process of changing the format of a production line from one product to another.

    • It involves reconfiguring the machinery and equipment to accommodate the new product

    • It may require changing the packaging, labeling, and other materials used in the production process

    • It is a common practice in manufacturing to increase efficiency and flexibility

    • Example: Changing a production line from makin

  • Answered by AI
  • Q12. What is kpi instruction
  • Ans. 

    KPI instruction refers to the guidelines or rules that define how key performance indicators (KPIs) should be measured and reported.

    • KPI instruction provides a framework for measuring and reporting KPIs consistently and accurately.

    • It outlines the specific metrics that should be tracked and how they should be calculated.

    • KPI instruction also includes guidelines for setting targets and benchmarks for KPIs.

    • Examples of KPI i...

  • Answered by AI
  • Q13. What is iso - ts audit
  • Ans. 

    ISO-TS audit is a quality management system audit for automotive industry.

    • ISO-TS audit is a quality management system audit for automotive industry

    • It is based on ISO 9001 standard and specific requirements for automotive industry

    • It focuses on ensuring product quality, safety, and customer satisfaction

    • It involves auditing the entire production process from design to delivery

    • Examples of ISO-TS audit include audits of car

  • Answered by AI
  • Q14. What is line and machining processing
  • Ans. 

    Line and machining processing are methods used in manufacturing to produce products efficiently and accurately.

    • Line processing involves a series of steps in which a product is assembled or produced in a linear fashion.

    • Machining processing involves the use of machines to shape and cut materials into specific shapes and sizes.

    • Both methods are used to increase efficiency and accuracy in manufacturing processes.

    • Examples of...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge production department and basic knowledge ERP, excel.,Sap, and basic knowledge maintenance

GYMA Food Industries Interview FAQs

How many rounds are there in GYMA Food Industries Production Supervisor interview?
GYMA Food Industries interview process usually has 3 rounds. The most common rounds in the GYMA Food Industries interview process are Resume Shortlist, HR and Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 GYMA Food Industries interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Quality Controller
3 salaries
unlock blur

₹5.3 L/yr - ₹7 L/yr

General Accountant
3 salaries
unlock blur

₹3.2 L/yr - ₹3.2 L/yr

Explore more salaries
Compare GYMA Food Industries with

Dhoot Transmission

3.7
Compare

ZF Steering Gear

3.7
Compare

Amphenol Interconnect

4.2
Compare

Ag Industries

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview