Filter interviews by
Initial setting time of cement is the time taken by the cement to harden and attain a particular level of strength.
The initial setting time of cement is typically around 30 minutes to 2 hours, depending on the type of cement and environmental conditions.
This time is important for construction workers to know, as it determines when they can start working with the cement.
The setting time can be affected by factors such a...
To calculate kg of bar for 1 mtr, we need to know the density of the bar.
Density of the bar is required to calculate the weight of the bar per unit length.
Formula: Weight of bar = (D^2/162) * L, where D is diameter of the bar and L is length of the bar.
Density of steel is 7850 kg/m^3, so weight of steel bar of 1 meter length with diameter of 20 mm will be (20^2/162) * 1 * 7850 = 24.2 kg.
Workability of concrete refers to its ability to be easily mixed, placed, and compacted.
Workability is affected by factors such as water content, aggregate size and shape, and cement content.
Concrete with good workability can be easily placed and compacted without segregation or bleeding.
Workability can be measured using tests such as slump test, flow test, and compacting factor test.
Different types of concrete may req...
Top trending discussions
Assistant Engineer
45
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Assistant Engineer - Civil
23
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Assistant Electrical Engineer
8
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Assistant Engineer 1
5
salaries
| ₹2.4 L/yr - ₹3.3 L/yr |
Electrical Engineer
4
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Maharashtra State Road Development Corporation Ltd.
Karnataka State Police Housing And Infrastructure Development Corporation
Rajasthan State Industrial Development Investment
Tamil Nadu Housing Board