DB1701 and HP5 columns are commonly used in chromatography due to their high thermal stability and wide range of applications.
DB1701 and HP5 columns are both stationary phases used in gas chromatography.
DB1701 column is a non-polar phase, while HP5 column is a polar phase.
DB1701 column is commonly used for analyzing volatile organic compounds (VOCs) in environmental samples.
HP5 column is often used for analyzing polar ...
I applied via Referral and was interviewed before Sep 2021. There were 4 interview rounds.
General attributes ,Basic knowledge,English,maths
I applied via Recruitment Consulltant and was interviewed before May 2021. There were 2 interview rounds.
Construction site safety rules and regulations
I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 3 interview rounds.
Yes, I have worked on Aspen HYSYS.
I have experience using Aspen HYSYS for process simulation and optimization.
I have used Aspen HYSYS to design and optimize various chemical processes.
I am familiar with the software's capabilities and have used it to model complex systems.
I have also used Aspen HYSYS to perform sensitivity analyses and evaluate different scenarios.
Overall, my experience with Aspen HYSYS has been valuab
Sizing of PSV and vent
PSV (Pressure Safety Valve) should be sized based on the maximum possible flow rate and the set pressure of the system
Vent should be sized based on the maximum possible flow rate and the back pressure of the system
Factors like fluid properties, temperature, and pressure drop should also be considered while sizing PSV and vent
Proper sizing of PSV and vent is crucial for ensuring the safety of the s
A P&ID of a scrubber is a diagram that shows the process flow and equipment involved in removing pollutants from industrial exhaust gases.
The P&ID should include the inlet and outlet streams, as well as the scrubbing liquid and any necessary pumps or valves.
The scrubber itself should be clearly labeled and include details such as the type of scrubbing media used (e.g. water, chemicals) and any associated instrumentatio...
I appeared for an interview in Mar 2021.
I applied via Walk-in and was interviewed in Nov 2020. There were 5 interview rounds.
based on 1 review
Rating in categories
Fireman
26
salaries
| ₹1.4 L/yr - ₹2.7 L/yr |
Manager
24
salaries
| ₹12 L/yr - ₹26 L/yr |
Mechanical Engineer
15
salaries
| ₹2.6 L/yr - ₹12 L/yr |
Senior Shift Engineer
12
salaries
| ₹13.2 L/yr - ₹20 L/yr |
Senior Manager
11
salaries
| ₹16 L/yr - ₹36.5 L/yr |
Aarti Industries
UPL
Coromandel International
PI Industries