Filter interviews by
I applied via Approached by Company and was interviewed before Sep 2022. There were 4 interview rounds.
The type of smoke in DG's is typically exhaust smoke from the diesel engine.
DG's (diesel generators) produce exhaust smoke as a byproduct of combustion
The color of the smoke can indicate potential issues with the engine (e.g. black smoke may indicate incomplete combustion)
Regular maintenance and proper tuning can help reduce smoke emissions
N-E voltage refers to the voltage between neutral and earth in a system. Earthing is used to provide a path for fault currents to safely dissipate.
N-E voltage is the voltage difference between the neutral and earth points in an electrical system
Earthing is essential to provide a path for fault currents to flow safely to the ground
Earthing helps in protecting equipment and individuals from electric shocks
Proper earthing...
Power stroke in DG refers to the downward movement of the piston in a diesel engine, compressing the air-fuel mixture for combustion.
Power stroke is the third stage of the four-stroke cycle in a diesel engine
During the power stroke, the piston moves downward, compressing the air-fuel mixture
The compressed mixture is ignited by the heat of compression, leading to combustion and the generation of power
The power stroke is...
I applied via Other and was interviewed before Mar 2018. There were 3 interview rounds.
The question is unclear and lacks context.
Request clarification on what is meant by 'transfer customer'
Ask for more information about the specific role and responsibilities of an Assistant Manager
Seek clarification on the purpose or objective behind the question
posted on 27 Mar 2018
I was interviewed in Mar 2018.
posted on 5 May 2021
I applied via Company Website and was interviewed in Nov 2020. There were 4 interview rounds.
I applied via Referral and was interviewed before Aug 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Uptime in onm refers to the amount of time a system or service is operational and available for use.
Uptime is typically measured as a percentage of total time, with 100% uptime indicating continuous availability.
Factors affecting uptime include maintenance schedules, system reliability, and response to downtime incidents.
For example, a system with 99.9% uptime would be operational for 99.9% of the total time period.
Mon...
posted on 23 Mar 2024
I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.
Different types of questions from others interviewer.
I was interviewed in Jan 2025.
Teledensity in India refers to the number of telephone connections for every hundred individuals in the country.
Teledensity is an important indicator of the level of telecommunication development in a country.
It is calculated by dividing the total number of telephone connections by the total population and then multiplying by 100.
India has seen a significant increase in teledensity over the years due to the rapid expan...
Mobile phones are necessary in today's world for communication, access to information, productivity, and entertainment.
Communication: Mobile phones allow us to easily stay in touch with others through calls, texts, and social media.
Access to information: With the internet at our fingertips, we can quickly look up information, news, and resources.
Productivity: Mobile phones enable us to work on the go, manage tasks, and...
based on 1 interview
Interview experience
Assistant Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
NOC Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
MIS Executive
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Cluster Manager
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Indus Towers
Bharti Infratel
American Tower Corporation
Reliance Communications