EHV power transformers consist of several components including windings, core, insulation, bushings, and cooling system.
Windings - primary and secondary windings made of copper or aluminum
Core - made of laminated steel to reduce eddy current losses
Insulation - used to insulate the windings and core from each other
Bushings - used to connect the transformer to the power system
Cooling system - used to dissipate heat gener...
The latest technology in transformer fire exposition safety system includes advanced monitoring systems, fire suppression techniques, and enhanced insulation materials.
Advanced monitoring systems use sensors to detect abnormal temperature rise or gas emissions, triggering alarms and shutdowns.
Fire suppression techniques include the use of automatic water mist systems, which quickly extinguish fires and minimize damage.
...
To check an electrical tester, follow these steps:
Ensure the tester is properly calibrated
Check the battery level and replace if necessary
Test the tester on a known live circuit
Verify that the tester gives the expected readings
Inspect the tester for any physical damage or loose connections
The installation procedure of a new transformer involves testing the BDV of oil and filtering the oil.
Inspect the site and ensure it meets safety requirements
Transport the transformer to the site and position it correctly
Connect the transformer to the electrical system
Test the BDV of the oil to ensure it meets specifications
Filter the oil to remove any impurities
Fill the transformer with oil
Test the transformer to ensu
Top trending discussions
posted on 21 Dec 2024
Some of the top questions asked at the GK Power Transmission Electrical Engineer interview -
Senior Automation Engineer
3
salaries
| ₹3.5 L/yr - ₹6 L/yr |
Bajaj Finserv
Wells Fargo
JPMorgan Chase & Co.
HSBC Group