Filter interviews by
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
In 5 years, I see myself as a successful and accomplished Jr. Officer, leading a team and making significant contributions to the organization.
Leading a team of junior officers and guiding them towards success
Implementing innovative strategies to improve efficiency and productivity
Building strong relationships with clients and stakeholders
Continuously learning and growing in my role through professional development opp...
I am a motivated and dedicated individual with a strong background in leadership and problem-solving.
Leadership skills: I have served as the president of my college student council, where I successfully organized various events and represented the student body.
Problem-solving abilities: During my internship at a local company, I was responsible for analyzing data and finding innovative solutions to improve efficiency.
S...
Top trending discussions
I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.
Preparedness for Leaktest involves thorough understanding of procedures, equipment, and safety protocols.
Familiarize yourself with the equipment and procedures for conducting a leak test
Ensure you understand the safety protocols and precautions to be taken during the test
Practice conducting leak tests to become proficient in the process
Be prepared to troubleshoot any issues that may arise during the test
Teaching camera involves explaining its functions, settings, and techniques for capturing quality photos.
Start by explaining the basic functions of the camera such as shutter speed, aperture, and ISO.
Demonstrate how to adjust settings to achieve desired effects like depth of field or motion blur.
Teach composition techniques like rule of thirds, leading lines, and framing to improve photo quality.
Encourage practice and ...
I was interviewed before Dec 2022.
PLC/DCS system stands for Programmable Logic Controller/Distributed Control System. It is a computerized control system used in industrial automation.
PLC is a type of industrial digital computer used for controlling manufacturing processes.
DCS is a control system used to control complex, large-scale processes in industries such as power plants and oil refineries.
PLC is more suitable for discrete control applications, w...
Types of heat exchangers include shell and tube, plate, and finned tube.
Shell and tube heat exchangers have a shell with tubes inside for fluid exchange.
Plate heat exchangers use plates to transfer heat between fluids.
Finned tube heat exchangers have tubes with fins attached to increase surface area for heat transfer.
I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
The previous company had a structured working process and a collaborative work culture.
The company had a clear hierarchy and defined roles and responsibilities.
There were regular team meetings and progress updates.
Employees were encouraged to share ideas and collaborate on projects.
The company had a supportive and inclusive work environment.
There were opportunities for professional development and growth.
Examples: Regu...
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Walk-in
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
I have worked with various processes and equipment in my previous roles.
I have experience with process optimization and improvement.
I have worked with equipment maintenance and troubleshooting.
I have used software tools for data analysis and reporting.
I have trained team members on process and equipment usage.
I have implemented safety protocols and procedures.
Examples: Lean Six Sigma methodologies, CNC machines, data a
I have experience working with pressurized water reactors (PWR) and boiling water reactors (BWR).
Pressurized water reactors (PWR)
Boiling water reactors (BWR)
To apply heating, cooling, chilling, and brine to reactor, I will use appropriate equipment and control systems.
Select appropriate equipment for heating, cooling, chilling, and brine application
Install and connect the equipment to the reactor
Set up control systems to regulate the temperature and flow rate of the heating, cooling, chilling, and brine
Monitor the process to ensure the desired temperature and flow rate is ...
I have handled various solvents including acetone, ethanol, and methanol. I am familiar with their boiling points and densities.
Acetone - boiling point: 56.05°C, density: 0.789 g/cm³
Ethanol - boiling point: 78.37°C, density: 0.789 g/cm³
Methanol - boiling point: 64.7°C, density: 0.7918 g/cm³
The equations I use for charging lot into the reactor depend on the type of lot and the reactor design.
Equations vary based on lot type and reactor design
Factors such as temperature, pressure, and flow rate must be considered
Examples of equations include mass balance equations and energy balance equations
Area Business Manager
20
salaries
| ₹3.7 L/yr - ₹12 L/yr |
Medical Representative
17
salaries
| ₹1.8 L/yr - ₹6.5 L/yr |
Area Sales Manager
8
salaries
| ₹5 L/yr - ₹12.8 L/yr |
Officer
7
salaries
| ₹1.8 L/yr - ₹5 L/yr |
QC Officer
6
salaries
| ₹1.5 L/yr - ₹6 L/yr |
Cipla
Sun Pharmaceutical Industries
DRJ & CO
Lupin