i
GAUTAM TECHNOCAST
Filter interviews by
I applied via Naukri.com and was interviewed before Mar 2021. There were 3 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.
I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.
Seeking new challenges and opportunities for skill development
Leaving for career growth and advancement
Experience and expertise in the field
Ability to contribute effectively to the team and projects
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
Quality Engineer
11
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Maintenance Engineer
4
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Foundry Engineer
4
salaries
| ₹2.8 L/yr - ₹4 L/yr |
Maintenance Manager
3
salaries
| ₹7 L/yr - ₹11 L/yr |
Quality Inspector
3
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
Afcons Infrastructure
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company