Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There was 1 interview round.
Top trending discussions
posted on 1 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 24 Apr 2023
I applied via Referral and was interviewed before Apr 2022. There was 1 interview round.
My favourite subject is Mathematics.
I enjoy solving complex problems and equations.
I find it satisfying to arrive at a correct solution.
Mathematics is a fundamental subject that is applicable in various fields such as engineering and finance.
I applied via Campus Placement and was interviewed in Dec 2024. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
posted on 16 Oct 2024
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
I have a proven track record of successfully managing production processes and teams, resulting in increased efficiency and quality.
I have X years of experience in production management, including overseeing scheduling, budgeting, and quality control.
I have a strong understanding of lean manufacturing principles and have implemented strategies to streamline production processes.
I have a track record of improving produc...
posted on 16 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.
WI stands for Work Instruction, which is a detailed document that provides step-by-step instructions on how to perform a specific task or job.
Work Instructions are used to ensure consistency in processes and quality of output.
They typically include information such as materials needed, tools required, safety precautions, and specific steps to be followed.
Examples of Work Instructions include assembly instructions for a...
Cycle time production calculation is the total time it takes to produce one unit of a product.
Cycle time is calculated by dividing the total production time by the total number of units produced.
For example, if it takes 10 hours to produce 100 units, the cycle time would be 0.1 hours per unit.
Cycle time helps in identifying bottlenecks and improving efficiency in production processes.
FTT stands for First Time Through, a metric used to measure the percentage of products that pass inspection on the first attempt.
FTT is calculated by dividing the number of products that pass inspection on the first attempt by the total number of products inspected, then multiplying by 100 to get a percentage.
FTT is an important metric for measuring the efficiency and quality of production processes.
For example, if 90 ...
OEE stands for Overall Equipment Effectiveness, a metric used to measure the efficiency of a manufacturing process.
OEE takes into account three factors: availability, performance, and quality.
It is calculated by multiplying availability, performance, and quality percentages.
For example, if a machine is available 90% of the time, operates at 80% of its maximum speed, and produces good parts 95% of the time, the OEE woul
5s explaintion, what about kizen, TPM , 7QC tool, 8D ?
I applied via Walk-in
5s and TPM are methodologies used in manufacturing to improve efficiency and productivity.
5s stands for Sort, Set in order, Shine, Standardize, Sustain. It is a method for organizing the workplace to improve efficiency and safety.
TPM stands for Total Productive Maintenance. It is a method for maximizing the effectiveness of equipment by involving all employees in the maintenance process.
Example: Implementing 5s in a pr...
I applied via Walk-in and was interviewed in Sep 2023. There were 4 interview rounds.
I done already I have well knowledge about aptitude
Junior Engineer
150
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Quality Engineer
88
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Engineer Trainee
54
salaries
| ₹1.5 L/yr - ₹3.1 L/yr |
Engineer
51
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Senior Engineer
38
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Bharat Forge
Tata Technologies
BHEL
Larsen & Toubro Limited