Production productivity type refers to the method or approach used to measure and improve productivity in a manufacturing setting.
Different types include labor productivity, machine productivity, and overall equipment effectiveness (OEE).
Labor productivity measures the output per worker or per labor hour.
Machine productivity measures the output per machine or equipment.
OEE measures the overall efficiency of a productio...
Production productivity type refers to the method used to measure and improve efficiency in manufacturing processes.
Different types include OEE (Overall Equipment Effectiveness), Takt time, and Cycle time
OEE measures the percentage of planned production time that is truly productive
Takt time is the rate at which a product must be produced to meet customer demand
Cycle time is the total time it takes to complete a proces
posted on 1 Jul 2022
I applied via Recruitment Consulltant
posted on 12 May 2024
I applied via Job Fair and was interviewed in Apr 2024. There were 2 interview rounds.
Production productivity type refers to the method or approach used to measure and improve productivity in a manufacturing setting.
Different types include labor productivity, machine productivity, and overall equipment effectiveness (OEE).
Labor productivity measures the output per worker or per labor hour.
Machine productivity measures the output per machine or equipment.
OEE measures the overall efficiency of a productio...
Production productivity type refers to the method used to measure and improve efficiency in manufacturing processes.
Different types include OEE (Overall Equipment Effectiveness), Takt time, and Cycle time
OEE measures the percentage of planned production time that is truly productive
Takt time is the rate at which a product must be produced to meet customer demand
Cycle time is the total time it takes to complete a proces
posted on 1 Jul 2022
I applied via Recruitment Consulltant
based on 2 reviews
Rating in categories
Production Engineer
8
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Assistant Manager
7
salaries
| ₹8.4 L/yr - ₹15.5 L/yr |
Quality Engineer
6
salaries
| ₹3 L/yr - ₹4.3 L/yr |
Electrical Maintenance Engineer
5
salaries
| ₹4 L/yr - ₹5.7 L/yr |
Executive Accountant
5
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Super Auto India
Lloyd Electric & Engineering
Ferromatik Milacron
MELCO