Eversendai
10+ Siemens Gamesa Renewable Power Private Limited Interview Questions and Answers
Q1. How do your control points shift, one floor to the next floor?
Control points are shifted vertically using plumb bobs and laser levels.
Control points are established on the ground floor using surveying instruments.
Plumb bobs and laser levels are used to transfer the control points vertically to the next floor.
The control points are re-established on the next floor using the transferred points as reference.
This process is repeated for each floor of the building.
The accuracy of the control points is crucial for ensuring the building is con...read more
Q2. What is the difference between post pour & pre pour
Post pour and pre pour are two stages in the concrete pouring process.
Pre pour refers to the activities and preparations done before pouring the concrete.
Post pour refers to the activities and inspections done after the concrete has been poured.
Pre pour activities include formwork installation, reinforcement placement, and concrete mix preparation.
Post pour activities include curing, finishing, and quality control inspections.
Pre pour inspections ensure that the site is ready...read more
Q3. What is the work area doing in one bag gypsum
The work area in one bag gypsum involves applying and finishing gypsum-based materials for walls and ceilings.
Applying gypsum-based materials to walls and ceilings
Finishing the applied materials to achieve a smooth and even surface
Repairing any imperfections or cracks in the gypsum
Sanding and smoothing the surface for a polished look
Ensuring proper adhesion and durability of the gypsum materials
Q4. do you know columns & core-wall offset marking?
Yes, I am familiar with columns and core-wall offset marking.
Columns and core-walls are marked with a specific offset to ensure proper alignment and placement.
This marking is usually done using a chalk line or laser level.
The offset distance is determined by the project specifications and can vary depending on the size and location of the columns and core-walls.
Proper offset marking is crucial for the structural integrity of the building.
For example, if the offset is not corr...read more
Q5. what is the height of top guard rails,mid rails and toe board rails?
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific regulations may dictate the exact height requirements for...read more
Q6. Where is your control points & TBM.
Control points & TBM are located at specific coordinates on the site.
Control points are established to provide a reference for surveying measurements.
TBM (Temporary Bench Mark) is a point of known elevation used as a reference for leveling.
The location of control points and TBM are determined based on the project requirements and site conditions.
They are typically marked with a stake or monument and recorded in a survey logbook.
Q7. Previous projects shuttering area and type of formwork
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
Q8. what is safe working load and formula?
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's guidelines and safety regulations when determining and us...read more
Q9. do you know Resection?
Yes, Resection is a surveying technique used to determine the location of an unknown point by sighting in on known points.
Resection involves using at least two known points and measuring the angles between them and the unknown point.
The intersection of these angles gives the location of the unknown point.
Resection is commonly used in land surveying and mapping.
It can also be used in navigation and military applications.
Q10. How do you Level shifting
Level shifting is the process of converting a signal from one voltage level to another.
Level shifting can be done using voltage dividers, operational amplifiers, or digital logic circuits.
Voltage dividers are used to reduce the voltage level of a signal.
Operational amplifiers can be used to amplify or attenuate a signal to the desired level.
Digital logic circuits can be used to convert a signal from one logic level to another.
Level shifting is commonly used in electronics to ...read more
Q11. What is HIRA &heirachy of Control measure
HIRA stands for Hazard Identification and Risk Assessment. Hierarchy of Control Measures is a systematic approach to eliminate or minimize hazards.
HIRA is a process of identifying potential hazards and analyzing the associated risks.
Hierarchy of Control Measures is a step-by-step approach to eliminate or minimize hazards.
The hierarchy includes five levels: elimination, substitution, engineering controls, administrative controls, and personal protective equipment.
Elimination i...read more
Q12. What precautions to be taken in lifting work
Precautions must be taken to ensure safe lifting work.
Assess the weight of the load and ensure it is within the safe lifting limit.
Use proper lifting techniques, such as bending at the knees and keeping the back straight.
Wear appropriate personal protective equipment, such as gloves and safety shoes.
Ensure the lifting area is clear of obstacles and hazards.
Use mechanical aids, such as cranes or forklifts, for heavy loads.
Train workers on safe lifting practices and provide reg...read more
Q13. Do you know AutoCAD?
Yes, I am proficient in AutoCAD.
I have experience using AutoCAD for creating and editing engineering drawings.
I am familiar with various AutoCAD commands and tools.
I have used AutoCAD to create 2D and 3D models for surveying projects.
I am able to import and export data from AutoCAD to other software programs.
I am comfortable working with different file formats in AutoCAD.
Q14. How to provide fall arresting system in high rise storry
Fall arresting system in high rise story can be provided through various means.
Use of safety nets
Installation of guardrails
Use of personal fall arrest systems
Proper training and education of workers
Regular inspection and maintenance of equipment
Q15. Do you know travees?
Yes, travees are used in surveying to mark points on the ground.
Travees are wooden or metal stakes used to mark points on the ground during surveying.
They are often used to mark the corners of a property or the location of a proposed structure.
Travees can also be used to mark the location of underground utilities or other features.
Surveyors use a variety of tools and techniques to accurately measure and mark points on the ground.
Travees are an important part of this process a...read more
Q16. Any other formwork material stock to be handled
Yes, other formwork materials such as aluminum, steel, and plastic are also handled.
Aluminum formwork
Steel formwork
Plastic formwork
Q17. What is the SBC (Soil Bearing Capacity) of Adyar?
The Soil Bearing Capacity of Adyar varies depending on the specific location and soil composition.
Soil bearing capacity is typically measured in terms of pressure per unit area that the soil can support without failure.
Factors affecting soil bearing capacity include soil type, moisture content, compaction, and depth.
For Adyar, the soil bearing capacity can range from 1000 to 5000 kN/m^2 depending on the specific location and soil conditions.
Q18. Explain about Industry Standard Operating Procedures
Industry Standard Operating Procedures are a set of guidelines and instructions that are followed by organizations to ensure consistency and efficiency in their operations.
Industry Standard Operating Procedures are developed based on industry best practices and regulatory requirements.
They provide step-by-step instructions for performing tasks and processes.
They help ensure consistency in operations and reduce the risk of errors and accidents.
Examples of Industry Standard Ope...read more
Q19. Concepts used in the projects
Utilized concepts like machine learning, data analysis, and software development in various projects.
Implemented machine learning algorithms for predictive maintenance in manufacturing industry
Utilized data analysis techniques to optimize supply chain operations
Developed software applications for automation of manual processes
More about working at Eversendai
Top HR Questions asked in Siemens Gamesa Renewable Power Private Limited
Interview Process at Siemens Gamesa Renewable Power Private Limited
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month