Q1. what is the total cost of a residential building per built up area ?

Ans.

The total cost of a residential building per built up area depends on various factors such as location, materials used, labor costs, and amenities.

  • Total cost = Cost of land + Cost of construction + Cost of amenities

  • Cost of land can vary greatly depending on location and size of the plot

  • Cost of construction includes materials, labor, and overhead expenses

  • Cost of amenities such as landscaping, parking, and utilities should also be considered

  • Example: In a high-end neighborhood, ...read more

Add your answer

Q2. Rate of mivan shuttering per Sqm ( Material + Labour ) ?

Ans.

The rate of Mivan shuttering per Sqm includes both material and labor costs.

  • The rate of Mivan shuttering per Sqm can vary depending on factors such as location, project size, and contractor rates.

  • Material costs for Mivan shuttering may include aluminum formwork panels, pins, wedges, and other accessories.

  • Labor costs for Mivan shuttering involve the installation, dismantling, and maintenance of the formwork system.

  • For example, in a particular project, the rate of Mivan shutter...read more

Add your answer

Q3. thumb rule for calculation of mivan shuttering per sqft of built up area ?

Ans.

The thumb rule for calculation of mivan shuttering per sqft of built up area is typically around 0.15 to 0.20 sqft per sqft of built up area.

  • The thumb rule for mivan shuttering is generally around 0.15 to 0.20 sqft per sqft of built up area.

  • This rule may vary depending on the complexity of the structure and other factors.

  • For example, for a simple structure, the mivan shuttering calculation may be closer to 0.15 sqft per sqft of built up area.

  • However, for a more complex struct...read more

Add your answer

Q4. Cost calculation per built up area of Civil works ?

Ans.

Cost calculation per built up area of Civil works involves determining the total cost of construction per unit area.

  • Calculate the total cost of construction including materials, labor, equipment, and overhead expenses.

  • Divide the total cost by the built up area to get the cost per unit area.

  • Consider factors such as site conditions, complexity of design, and local market rates.

  • Example: Total cost of construction is $100,000 for a built up area of 2000 sq. ft. Cost per unit area...read more

Add your answer
Discover Bain & Company interview dos and don'ts from real experiences

Q5. What is anchorage length in BBS ?

Ans.

Anchorage length in BBS refers to the length of reinforcement bar required to transfer the load from the bar to the concrete.

  • Anchorage length is determined based on the diameter of the reinforcement bar and the type of load it will be subjected to.

  • It is essential to ensure proper anchorage length to prevent failure of the structure.

  • Anchorage length is typically specified in building codes and design standards.

  • For example, in a column reinforcement schedule, the anchorage leng...read more

Add your answer

Q6. ERP for management budgeting in Real Estate

Ans.

ERP systems are commonly used in Real Estate for management budgeting.

  • ERP systems help in integrating financial data for better budgeting and forecasting in Real Estate.

  • They streamline processes like expense tracking, revenue management, and financial reporting.

  • Examples of ERP systems used in Real Estate include Yardi, MRI Software, and RealPage.

  • These systems provide real-time insights and analytics to make informed budgeting decisions.

Add your answer

Q7. Coefficient of Steel & Concrete ?

Ans.

The coefficient of steel and concrete refers to the thermal expansion properties of these materials.

  • The coefficient of thermal expansion for steel is typically around 12 x 10^-6 /°C.

  • The coefficient of thermal expansion for concrete is typically around 10 x 10^-6 /°C.

  • These coefficients are important to consider when designing structures to account for temperature changes.

Add your answer

Q8. Lap zone in column ?

Ans.

Lap zone in column refers to the overlapping region where two reinforcement bars are spliced together.

  • Lap zone is typically located in the middle third of the column height for better load distribution.

  • Proper lap length and lap splice configuration are crucial for structural integrity.

  • Lap splices are commonly used in reinforced concrete columns to achieve required strength.

  • Lap length is determined based on the diameter of the reinforcement bars and the structural design requi...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter