Filter interviews by
Top trending discussions
posted on 8 Nov 2021
I applied via Referral and was interviewed before Nov 2020. There were 6 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
In my previous role, I managed projects, collaborated with teams, and ensured timely delivery of engineering solutions.
Led a team of 5 engineers in the design and implementation of a new product line, resulting in a 20% increase in efficiency.
Collaborated with cross-functional teams to troubleshoot and resolve technical issues, improving product reliability.
Conducted regular project meetings to track progress and align...
posted on 12 Feb 2023
I applied via LinkedIn and was interviewed in Jan 2024. There were 2 interview rounds.
I appeared for an interview in Oct 2017.
Questions related to torque, gearbox, torque limiter and coupling failure, yawing system bearing, and accumulator.
Torque is a measure of rotational force.
Gearbox works by transmitting power from the engine to the wheels.
Torque limiter failure can be caused by overloading or overheating.
Coupling failure can be caused by misalignment or excessive torque.
Yawing system bearing is a type of roller bearing used to support th...
posted on 8 Nov 2021
Basic Study
Initial setting time of cement is the time taken by cement to harden and resist penetration by a standard needle.
Initial setting time is affected by factors like temperature, water-cement ratio, and type of cement.
The standard needle used for testing has a diameter of 1.13 mm and a length of 50 mm.
The initial setting time of ordinary Portland cement is around 30 minutes.
The initial setting time of rapid hardening cemen
Lime test stone test brick test
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
I have 2 years of experience in the wind field.
I have worked on wind turbine design and optimization projects.
I have conducted wind resource assessments for potential wind farm sites.
I have experience in analyzing wind data and performing wind flow modeling.
I have knowledge of wind energy conversion systems and their components.
I have worked with software tools like WindPRO and WAsP for wind energy analysis.
Staff Engineer
93
salaries
| ₹16.4 L/yr - ₹55 L/yr |
Associate Engineer
87
salaries
| ₹2 L/yr - ₹9.2 L/yr |
Engineer- Customer Support
70
salaries
| ₹4.9 L/yr - ₹12.1 L/yr |
Product Manager
49
salaries
| ₹23 L/yr - ₹70.2 L/yr |
Junior Engineer
48
salaries
| ₹1.9 L/yr - ₹3.7 L/yr |
Vestas
Siemens Energy
Steag Energy Services
Assystem