Filter interviews by
I applied via Job Portal and was interviewed in Mar 2023. There were 3 interview rounds.
Heating, Ventilation, and Air Conditioning
HVAC stands for Heating, Ventilation, and Air Conditioning
It is a system used to provide heating and cooling services to buildings
HVAC systems control the temperature, humidity, and air quality in a building
Examples of HVAC equipment include furnaces, air conditioners, and ventilation systems
Sensible heat is heat that causes a change in temperature, while latent heat is heat that causes a change in state.
Sensible heat is the heat that can be felt and measured with a thermometer.
Latent heat is the heat absorbed or released during a change of state without a change in temperature.
Examples of latent heat include the heat absorbed during evaporation of water or the heat released during condensation of steam.
Yes, a heat load sheet is a document used to calculate the amount of heating or cooling required for a space.
Gather information on the building's dimensions, insulation, windows, and occupancy
Calculate the heat gain or loss from each component using relevant formulas
Sum up the total heat load to determine the HVAC system capacity needed
Include factors like climate, equipment, and ventilation in the calculations
Top trending discussions
I applied via Company Website and was interviewed in Sep 2022. There were 2 interview rounds.
The strength of mechanical equipment is determined by its ability to withstand stress and strain without failure.
Strength can be measured through various tests such as tensile, compression, and fatigue testing.
Factors such as material properties, design, and manufacturing processes can affect the strength of equipment.
Regular maintenance and inspections can help identify potential weaknesses and prevent equipment failu...
PHP code to connect with a database
Use the mysqli_connect() function to establish a connection
Provide the database hostname, username, password, and database name as parameters
Check if the connection is successful using the mysqli_connect_errno() function
Close the connection using the mysqli_close() function when done
I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.
Maintenance is the process of ensuring that equipment, machinery, or facilities are in good working condition.
Preventive maintenance to avoid breakdowns
Corrective maintenance to fix issues
Predictive maintenance to anticipate problems
Regular inspections and cleaning
Replacing worn-out parts
Ensuring safety standards are met
Keeping records of maintenance activities
posted on 4 Feb 2021
I applied via Referral and was interviewed in Aug 2020. There were 4 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2022. There were 3 interview rounds.
To diagnose wiring and electrical faults, a maintenance engineer can follow these steps:
Start by visually inspecting the wiring and electrical components for any visible damage or loose connections.
Use a multimeter to test the continuity of wires and check for voltage drops or fluctuations.
Perform insulation resistance tests to identify any insulation breakdown or leakage.
Utilize circuit testers or voltage detectors to...
The most difficult electrical installation I completed was rewiring an entire industrial facility.
Rewiring an entire industrial facility required extensive planning and coordination.
I had to carefully map out the existing electrical system and create a detailed plan for the new wiring.
The installation involved working with high voltage equipment and ensuring safety measures were followed.
I had to troubleshoot and resol...
posted on 19 Jan 2023
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Project Engineer
14
salaries
| ₹2.2 L/yr - ₹6.5 L/yr |
Project Engineer Hvac
9
salaries
| ₹3 L/yr - ₹5 L/yr |
Project Manager
6
salaries
| ₹4.6 L/yr - ₹9.7 L/yr |
Safety Engineer
5
salaries
| ₹3.3 L/yr - ₹4.6 L/yr |
Hvac Technician
5
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
American Oncology Institute
Synmac Consultants
Sterling Manufacturing Company
ACTE