Filter interviews by
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
Company details explain for that
Top trending discussions
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Preventive maintenance is the practice of regularly inspecting, cleaning, and servicing equipment in order to prevent breakdowns and prolong its lifespan.
Regularly inspecting equipment for signs of wear and tear
Cleaning and lubricating moving parts
Replacing worn out parts before they fail
Scheduling routine maintenance tasks based on manufacturer recommendations
Examples: changing oil in a car, cleaning air filters in HV
MTBF stands for Mean Time Between Failures and MTTR stands for Mean Time To Repair.
MTBF is the average time between failures of a system or component.
MTTR is the average time taken to repair a failed system or component.
MTBF is calculated as total operational time divided by the number of failures.
MTTR is calculated as total downtime divided by the number of repairs.
For example, if a computer system has an MTBF of 10,0...
Seeking new challenges and opportunities for growth.
Desire for professional growth and development
Seeking new challenges and experiences
Opportunity to learn new skills and expand knowledge
Desire for a more fulfilling or rewarding career
Seeking better work-life balance
I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Critical path is the longest path in a project schedule, representing the shortest time in which the project can be completed.
Critical path is the sequence of tasks that determines the total duration of a project.
It is the longest path through the project network diagram, with zero float or slack.
Any delay in tasks on the critical path will directly impact the project's completion date.
Identifying the critical path hel...
I was interviewed before Jun 2023.
The username of LA is typically a combination of letters, numbers, or symbols chosen by the user for identification purposes.
Usernames are unique identifiers used for logging into accounts or accessing online platforms.
LA could stand for Los Angeles, so the username might include references to the city or abbreviations like 'LA' or 'LAX'.
It could also be a personalized username chosen by the individual, such as 'LAlove
Transformer works on the principle of electromagnetic induction to transfer electrical energy between two or more circuits.
Transformers have two coils of wire, known as primary and secondary coils, wrapped around a core made of iron or steel.
When an alternating current flows through the primary coil, it creates a changing magnetic field around the core.
This changing magnetic field induces a voltage in the secondary coi...
I applied via LinkedIn and was interviewed before Apr 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jun 2021. There were 4 interview rounds.
Basic electrical topics. wind energy, solar
Your past experience and project repots
Yes about of renewability energy
based on 1 review
Rating in categories
Area Sales Manager
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Officer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Territory Sales Incharge
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Regional Sales Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Suzlon Group
Tata Power
Adani Green Energy
Azure Power