Filter interviews by
I applied via Referral and was interviewed before Jun 2021. There was 1 interview round.
Develop an app using SQLite to store login details and show it in the new screen
Create a SQLite database with a table for login details
Implement a registration and login functionality
Retrieve login details from the database and display on a new screen
Top trending discussions
I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 2 interview rounds.
Data structures and Algorithms
I applied via Recruitment Consulltant and was interviewed in Oct 2021. There were 3 interview rounds.
posted on 14 Mar 2025
I appeared for an interview in Feb 2025, where I was asked the following questions.
I applied via Approached by Company and was interviewed in Mar 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Apr 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Jun 2020. There were 4 interview rounds.
posted on 16 Feb 2025
I appeared for an interview in Jan 2025.
Vernier calipers are precision measuring tools used to measure internal and external dimensions with high accuracy.
Vernier calipers have a main scale and a sliding vernier scale for more precise measurements.
They can measure both inside and outside dimensions as well as depth.
Common types include digital vernier calipers and dial vernier calipers.
Some vernier calipers also have a depth gauge for measuring depths of hol
Tolerance is the allowable deviation from a specified value in manufacturing or engineering.
Tolerance is the range within which a dimension or measurement is allowed to vary.
It ensures that parts fit together properly and function as intended.
For example, a hole may have a diameter of 10mm with a tolerance of +/- 0.1mm.
posted on 29 Jan 2025
Quality control processes involve the systematic examination of production methods and outputs to ensure that products meet established standards. Problem analysis refers to the process of identifying, examining, and understanding issues that arise within these processes to improve product quality and efficiency.
Fire fighting Project responsibilities
Pipelines Installation
Quality control is a process used to ensure that products or services meet specified requirements and standards.
Quality control involves monitoring and testing products or services to identify defects or deviations from standards.
It aims to prevent defects and ensure consistency in production.
Examples include inspecting products on a production line, conducting audits of processes, and analyzing customer feedback.
Quali...
The process for installing fire fighting pipelines involves planning, designing, excavation, installation, testing, and commissioning.
Plan the layout of the pipeline system based on building codes and fire safety regulations.
Design the pipeline system to ensure adequate water supply and pressure for firefighting purposes.
Excavate the ground to lay down the pipelines in the designated locations.
Install the pipelines usi...
based on 2 reviews
Rating in categories
Associate Engineer
24
salaries
| ₹2 L/yr - ₹4.4 L/yr |
Engineer
20
salaries
| ₹2.6 L/yr - ₹6 L/yr |
Software Engineer
17
salaries
| ₹3.2 L/yr - ₹8.5 L/yr |
Technician
12
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Associate Software Engineer
11
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Microtek International
Transsion
TVS Electronics
Kutchina