Intrested in our work and responsibilities
Good working knowledge and do the work with our responsibility.
The OEE of the plant is 85%.
OEE stands for Overall Equipment Effectiveness.
It is a measure of how well a manufacturing process is performing.
It takes into account three factors: availability, performance, and quality.
An OEE of 85% is considered to be a good score.
It means that the plant is operating efficiently and effectively.
Approximately 100 tons of material is consumed in one month.
The material type and source should be identified.
The consumption rate should be monitored regularly.
Efforts should be made to reduce material waste.
The cost of material consumption should be analyzed.
I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.
Group discussion is when a group of people comes together to discuss a certain topic. Many Recruiters use group discussion (GD) to test a candidate's communication skills, leadership skills, test topic knowledge, etc. There are also two other types of GD that test the lateral thinking of a candidate.
Case study is an in-depth study of one person, group, or event. In a case study, nearly every aspect of the subject's life and history is analyzed to seek patterns and causes of behavior
posted on 4 Jun 2023
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
based on 1 review
Rating in categories
Quality Engineer
35
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Assistant Manager
17
salaries
| ₹6 L/yr - ₹9.5 L/yr |
Engineer
12
salaries
| ₹2.3 L/yr - ₹4.1 L/yr |
Production Engineer
12
salaries
| ₹2.7 L/yr - ₹4.2 L/yr |
Senior Engineer
7
salaries
| ₹3 L/yr - ₹9 L/yr |
LG Electronics
Samsung
Whirlpool
Godrej Appliances