Filter interviews by
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2023. There were 2 interview rounds.
Almost some 20 questions
I applied via Naukri.com and was interviewed in Apr 2022. There were 3 interview rounds.
All the project manager is very hard work
Structural load benefits include ensuring safety, stability, and durability of a building or structure.
Ensures safety by preventing structural failure under various loads and conditions
Provides stability by distributing loads evenly throughout the structure
Increases durability by ensuring the structure can withstand external forces such as wind, snow, and earthquakes
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Dec 2020. There was 1 interview round.
Process Control
Process control is my favorite subject in chemical engineering.
I enjoy studying the principles and techniques used to control and optimize chemical processes.
I find it fascinating how process control systems can improve efficiency, safety, and product quality.
One example of process control is the use of feedback loops to maintain desired operating conditions in a chemical reactor.
I also appreciate the im...
Thermodynamics is the study of energy and its transformations in various forms of matter.
Thermodynamics is used in the design and optimization of engines, power plants, refrigeration systems, and other devices that involve energy transfer.
It is also used in the study of chemical reactions and the behavior of materials at high temperatures and pressures.
Thermodynamics helps in understanding the properties of materials a...
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.
Productivity is the measure of efficiency in completing a task or achieving a goal.
It is the ratio of output to input.
It can be improved by optimizing processes and utilizing resources effectively.
Examples include completing tasks in less time, producing more output with the same resources, and reducing waste.
Productivity is important for businesses to remain competitive and profitable.
posted on 7 Sep 2021
Condensers are devices used to condense a substance from its gaseous to its liquid state.
There are two main types of condensers: air-cooled and water-cooled.
Air-cooled condensers use air as the cooling medium, while water-cooled condensers use water.
Examples of air-cooled condensers include car radiators and air conditioning units.
Examples of water-cooled condensers include cooling towers and refrigeration systems.
Othe...
based on 10 reviews
Rating in categories
Production Engineer
49
salaries
| ₹2.5 L/yr - ₹5.8 L/yr |
Engineer
41
salaries
| ₹2.7 L/yr - ₹4.8 L/yr |
Senior Engineer
27
salaries
| ₹4.2 L/yr - ₹7.2 L/yr |
Assistant Manager
25
salaries
| ₹6 L/yr - ₹9 L/yr |
Quality Engineer
24
salaries
| ₹1.6 L/yr - ₹4.4 L/yr |
LivSpace
HomeLane
Ozone Overseas
Flipspaces