Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Eaton Team. If you also belong to the team, you can get access from here

Eaton Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Eaton Technical Support Engineer Interview Questions and Answers

Updated 1 Dec 2023

Eaton Technical Support Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Elctrical Engineering and MV-LV Switchgear
Round 3 - One-on-one 

(1 Question)

  • Q1. Managerial and Operations
Round 4 - HR 

(1 Question)

  • Q1. Basic HR questions
Round 5 - One-on-one 

(1 Question)

  • Q1. Interview with Stakeholder

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is your main technical skill
  • Q2. Core methods and
  • Q3. Core technology
Round 3 - One-on-one 

(2 Questions)

  • Q1. What is your Family
  • Q2. Solo version in a family

Interview Preparation Tips

Interview preparation tips for other job seekers - Be good in your technical skills
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pure tech questions in which domain you are previously worked
  • Q2. Why you want job change

Interview Preparation Tips

Interview preparation tips for other job seekers - Study basics of engineering domain in which filed of job
Round 1 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. Share details of your previous job.
  • Q3. Total experience in O&M
Round 2 - Technical 

(3 Questions)

  • Q1. Brief about wind turbine WTG
  • Ans. 

    WTG is a device that converts wind energy into electrical energy.

    • WTG stands for Wind Turbine Generator

    • It consists of blades, rotor, nacelle, and tower

    • The blades capture wind energy and rotate the rotor

    • The rotor is connected to a generator that produces electricity

    • The nacelle houses the generator and other components

    • The tower supports the entire structure

    • WTGs can be onshore or offshore

    • They are a renewable source of ener

  • Answered by AI
  • Q2. Maintenance of 33kv vcb
  • Ans. 

    Maintenance of 33kv vcb involves regular inspection, cleaning, lubrication, and testing.

    • Inspecting the contacts and connections for signs of wear or damage

    • Cleaning the contacts and insulators to prevent buildup of dirt and dust

    • Lubricating the moving parts to ensure smooth operation

    • Testing the VCB for proper functioning and tripping time

    • Replacing any faulty components or parts

    • Following manufacturer's guidelines and safe

  • Answered by AI
  • Q3. Pcc & mcc panel and it's workin
  • Ans. 

    PCC and MCC panels are electrical control panels used to distribute power to various electrical loads.

    • PCC stands for Power Control Center and MCC stands for Motor Control Center.

    • PCC panels are used to distribute power to various electrical loads while MCC panels are used to control and protect electric motors.

    • PCC panels are generally used in power distribution systems while MCC panels are used in industrial application...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always gain knowledge in which field we working
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the of electricity? What do you understand by transmission and distribution of electricity?
  • Ans. 

    Transmission and distribution are the processes of delivering electricity from power plants to consumers.

    • Transmission involves high voltage power lines that transport electricity over long distances.

    • Distribution involves lower voltage power lines that deliver electricity to homes and businesses.

    • Both processes require transformers to step up or step down voltage as needed.

    • Smart grid technology is being used to improve t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updating your knowledge and you answer fearlessly.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is your main technical skill
  • Q2. Core methods and
  • Q3. Core technology
Round 3 - One-on-one 

(2 Questions)

  • Q1. What is your Family
  • Q2. Solo version in a family

Interview Preparation Tips

Interview preparation tips for other job seekers - Be good in your technical skills
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pure tech questions in which domain you are previously worked
  • Q2. Why you want job change

Interview Preparation Tips

Interview preparation tips for other job seekers - Study basics of engineering domain in which filed of job
Round 1 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. Share details of your previous job.
  • Q3. Total experience in O&M
Round 2 - Technical 

(3 Questions)

  • Q1. Brief about wind turbine WTG
  • Ans. 

    WTG is a device that converts wind energy into electrical energy.

    • WTG stands for Wind Turbine Generator

    • It consists of blades, rotor, nacelle, and tower

    • The blades capture wind energy and rotate the rotor

    • The rotor is connected to a generator that produces electricity

    • The nacelle houses the generator and other components

    • The tower supports the entire structure

    • WTGs can be onshore or offshore

    • They are a renewable source of ener

  • Answered by AI
  • Q2. Maintenance of 33kv vcb
  • Ans. 

    Maintenance of 33kv vcb involves regular inspection, cleaning, lubrication, and testing.

    • Inspecting the contacts and connections for signs of wear or damage

    • Cleaning the contacts and insulators to prevent buildup of dirt and dust

    • Lubricating the moving parts to ensure smooth operation

    • Testing the VCB for proper functioning and tripping time

    • Replacing any faulty components or parts

    • Following manufacturer's guidelines and safe

  • Answered by AI
  • Q3. Pcc & mcc panel and it's workin
  • Ans. 

    PCC and MCC panels are electrical control panels used to distribute power to various electrical loads.

    • PCC stands for Power Control Center and MCC stands for Motor Control Center.

    • PCC panels are used to distribute power to various electrical loads while MCC panels are used to control and protect electric motors.

    • PCC panels are generally used in power distribution systems while MCC panels are used in industrial application...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always gain knowledge in which field we working
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the of electricity? What do you understand by transmission and distribution of electricity?
  • Ans. 

    Transmission and distribution are the processes of delivering electricity from power plants to consumers.

    • Transmission involves high voltage power lines that transport electricity over long distances.

    • Distribution involves lower voltage power lines that deliver electricity to homes and businesses.

    • Both processes require transformers to step up or step down voltage as needed.

    • Smart grid technology is being used to improve t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updating your knowledge and you answer fearlessly.

Eaton Interview FAQs

How many rounds are there in Eaton Technical Support Engineer interview?
Eaton interview process usually has 5 rounds. The most common rounds in the Eaton interview process are One-on-one Round, Resume Shortlist and Technical.
How to prepare for Eaton Technical Support Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Eaton. The most common topics and skills that interviewers at Eaton expect are Technical Support, Engineering, Excel, Analytical and Communication Skills.

Tell us how to improve this page.

Eaton Technical Support Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Eaton Technical Support Engineer Salary
based on 12 salaries
₹2 L/yr - ₹10.5 L/yr
47% more than the average Technical Support Engineer Salary in India
View more details

Eaton Technical Support Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Analyst
441 salaries
unlock blur

₹4.6 L/yr - ₹17 L/yr

Associate Analyst
428 salaries
unlock blur

₹4.3 L/yr - ₹11.6 L/yr

Engineer
303 salaries
unlock blur

₹7.5 L/yr - ₹20 L/yr

Senior Analyst
270 salaries
unlock blur

₹7.5 L/yr - ₹27 L/yr

Senior Engineer
235 salaries
unlock blur

₹11.5 L/yr - ₹29 L/yr

Explore more salaries
Compare Eaton with

Schneider Electric

4.2
Compare

Siemens

4.1
Compare

ABB

4.1
Compare

Emerson Electric Co.

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview