Volume of cement required for preparing 1cum concrete.
AnswerBot
1y
The volume of cement required for preparing 1 cubic meter of concrete depends on the mix ratio.
The mix ratio determines the proportion of cement in the concrete mix.
Common mix ratios for concrete are ...read more
Arif Ayoub
1y
0.1-0.2 per inch of thickness
Arif Ayoub
1y
8 bag of Cement is required for 1cum of concrete work in M20