i
Digital Labour Chowk
Filter interviews by
I applied via Job Portal and was interviewed in Jan 2023. There were 3 interview rounds.
I chose Digital Marketing because of its dynamic nature and the opportunity to reach a wide audience through various online channels.
Passion for creativity and innovation in marketing strategies
Interest in analyzing data and optimizing campaigns for better results
Desire to stay updated with the latest trends and technologies in the digital space
SEO is optimizing website to rank higher in search engine results. SEM is paid advertising to increase visibility. SMM is using social media for marketing.
SEO involves optimizing website content, meta tags, and backlinks to improve organic search rankings.
SEM involves paid advertising on search engines like Google Ads to increase visibility and drive traffic.
SMM involves using social media platforms like Facebook, Inst...
Top trending discussions
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.
Data structures are used to manage large amounts of data efficiently.
They provide a way to organize data in a way that makes it easy to access and manipulate.
Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.
Explain logic of stack
I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.
Experienced business analyst with a background in data analysis and process improvement.
Over 5 years of experience in analyzing business processes and identifying areas for improvement
Skilled in data analysis tools such as Excel, SQL, and Tableau
Strong communication and problem-solving skills
Led a project to streamline inventory management processes, resulting in a 20% reduction in costs
I was interviewed before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
Admixtures are substances added to concrete to enhance its properties. They can be classified into different types.
Water-reducing admixtures: reduce the amount of water needed for a given concrete mix
Retarding admixtures: delay the setting time of concrete
Accelerating admixtures: speed up the setting time of concrete
Air-entraining admixtures: introduce tiny air bubbles to improve workability and durability
Superplastici...
Mineral admixtures have several disadvantages in construction.
Mineral admixtures can affect the workability of concrete, making it more difficult to handle and place.
They may increase the setting time of concrete, leading to delays in construction.
Some mineral admixtures, such as fly ash, can have a negative impact on the strength and durability of concrete.
Mineral admixtures may introduce variability in concrete prope...
The water cement ratio is affected by the addition of admixture.
The water cement ratio is the ratio of the weight of water to the weight of cement in a concrete mix.
When an admixture is added, it can change the properties of the concrete mix, including the water cement ratio.
Some admixtures, such as water-reducing admixtures, can decrease the water cement ratio by allowing for a lower water content while maintaining wo...
I am based in [location].
I am currently based in [location].
My current location is [location].
I am located in [location].
I was interviewed before Jul 2016.
I was interviewed before Jul 2016.
I am a dedicated and experienced HR professional with a passion for helping organizations thrive through effective talent management.
Over 5 years of experience in HR roles, including recruitment, employee relations, and performance management
Strong communication and interpersonal skills, with a focus on building positive relationships with employees and stakeholders
Proven track record of implementing HR strategies that...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Front end Developer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
GAMMON INDIA
Patil Group
Millennium Engineers & Contractors
Karam Industries