i
Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workspace.
Set in Order focuses on arranging tools and materials in a logical and efficient manner.
Shine involves cleaning and maintaining the workspace.
Standardize establishes guidelines and procedures for main...
Top trending discussions
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
Bajaj auto department role, about themes Full form,some basic aptitude
posted on 20 Jan 2023
I applied via Naukri.com and was interviewed in Dec 2022. There was 1 interview round.
I can contribute in quality management by implementing quality control measures, conducting regular audits, and ensuring compliance with industry standards.
Implementing quality control measures to ensure that products meet or exceed customer expectations
Conducting regular audits to identify areas for improvement and ensure compliance with industry standards
Developing and implementing training programs to educate employ...
posted on 19 Feb 2022
posted on 16 Jan 2025
Managing production involves planning, organizing, leading, and controlling the production process to ensure efficiency and quality.
Develop a production plan outlining goals, timelines, and resources.
Organize workflow to optimize efficiency and minimize waste.
Lead and motivate production team to meet targets and maintain quality standards.
Implement quality control measures to ensure products meet specifications.
Monitor...
Manpower can be managed effectively by proper planning, communication, training, and motivation.
Create a detailed schedule to allocate tasks and responsibilities efficiently.
Communicate clearly with team members to ensure everyone is on the same page.
Provide necessary training and development opportunities to enhance skills and knowledge.
Motivate employees through recognition, rewards, and feedback.
Regularly assess per...
Managing pri plan involves setting priorities, creating a plan, delegating tasks, monitoring progress, and adjusting as needed.
Set clear priorities based on importance and deadlines
Create a detailed plan outlining tasks, timelines, and responsibilities
Delegate tasks to team members based on their strengths and workload
Monitor progress regularly to ensure tasks are on track
Adjust the plan as needed to address any issues
Team leadership is crucial for ensuring productivity, motivation, and cohesion within a team.
Effective communication is key in team leadership
Setting clear goals and expectations for team members
Providing support and guidance to team members
Recognizing and rewarding team achievements
Resolving conflicts and promoting a positive team culture
Technical questions
1. How about tractor
2. How to work tandum pump
3. Air cleaner work
I applied via Walk-in and was interviewed in Jul 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
I appeared for an interview in Dec 2016.
A two-stroke engine completes a power cycle in two strokes of the piston, while a four-stroke engine completes it in four strokes.
Two-stroke engines have a simpler design and are lighter than four-stroke engines.
Two-stroke engines have a higher power-to-weight ratio but lower fuel efficiency compared to four-stroke engines.
Four-stroke engines have separate intake, compression, power, and exhaust strokes, while two-stro...
A pictorial representation of a SI engine with valve opening, TDC, and BDC.
SI engine stands for Spark Ignition engine, which is commonly used in gasoline-powered vehicles.
Valve opening refers to the movement of the intake and exhaust valves to allow fuel-air mixture in and exhaust gases out of the combustion chamber.
TDC (Top Dead Center) is the position of the piston at the extreme top of its stroke.
BDC (Bottom Dead Ce...
I would improve the fuel efficiency of TVS motorcycles by implementing advanced engine technology.
Implementing electronic fuel injection system for better fuel management
Introducing hybrid technology for improved mileage
Optimizing aerodynamics of the motorcycle for reduced drag
Using lightweight materials for better fuel economy
I am a dedicated production engineer with a strong background in manufacturing processes and quality control.
Graduated with a degree in Mechanical Engineering
Experience working in a manufacturing plant for 3 years
Proficient in CAD software for designing production layouts
Implemented lean manufacturing principles to improve efficiency
Led a team in reducing production downtime by 20%
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Manager
582
salaries
| ₹5.2 L/yr - ₹17.3 L/yr |
Senior Manager
339
salaries
| ₹9 L/yr - ₹23 L/yr |
Senior Engineer
318
salaries
| ₹4 L/yr - ₹12 L/yr |
Engineer
224
salaries
| ₹2.4 L/yr - ₹10.2 L/yr |
Junior Engineer
175
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
TVS Motor
Bajaj Auto
Escorts Kubota Limited
Sonalika Tractors