Filter interviews by
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
The printing machine may have a software or hardware issue causing it to be unable to disable. Troubleshooting is needed to identify and fix the problem.
Check if the printing machine is properly connected to power source
Inspect the control panel for any error messages or indicators
Restart the printing machine and see if the issue persists
Update or reinstall the printer driver software
Consult the user manual or contact
The die length and filter in use for the external coating machine are crucial for ensuring proper coating quality.
The die length determines the thickness and uniformity of the coating applied to the product.
The filter in use helps to remove any impurities or particles from the coating material, ensuring a smooth finish.
Examples: A die length of 2mm may be used for thin coatings, while a filter with a mesh size of 100 m
The heating problem in the pouching machine may be caused by a faulty heating element or thermostat.
Check the heating element for any signs of damage or malfunction.
Inspect the thermostat to ensure it is functioning properly.
Verify that the power supply to the machine is stable and sufficient.
Consider consulting a technician for further diagnosis and repair if needed.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Mar 2021. There was 1 interview round.
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
General topics 1 hr 25 % technical
Developmental activities in lab involve planning, executing, and analyzing experiments to understand biological processes.
Developmental activities in lab involve designing experiments to study the growth and differentiation of cells.
Researchers may use techniques such as cell culture, microscopy, and molecular biology to investigate developmental processes.
Data analysis is crucial in developmental biology to interpret ...
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There were 2 interview rounds.
My last company's CTC was $60,000 per year.
My last company offered a competitive salary package of $60,000 per year.
The CTC included base salary, bonuses, and benefits.
I was satisfied with the compensation package at my previous company.
To control manual oil pump and burners, follow proper maintenance procedures, adjust settings as needed, and monitor performance regularly.
Regularly inspect and maintain the oil pump and burners to ensure they are functioning properly
Adjust the settings on the oil pump and burners as needed to achieve the desired output
Monitor the performance of the oil pump and burners regularly to identify any issues or inefficiencie...
To changeover pumps in case of emergency, follow proper shutdown procedures, switch to backup pump, and restart system. For furnace operation, ensure proper ventilation, monitor temperature, and follow safety protocols.
Follow proper shutdown procedures for the affected pump to prevent damage.
Switch to the backup pump to maintain continuous operation.
Restart the system and monitor for any abnormalities or issues.
For fur...
Maintaining glass level involves regular monitoring, proper cleaning, and adjusting as needed.
Regularly check the glass level to ensure it is at the desired level
Clean the glass regularly to prevent build-up or obstruction
Adjust the glass level as needed based on the specific requirements of the system
Use appropriate tools and equipment for maintenance tasks
Train staff on proper maintenance procedures to ensure consist
I applied via Campus Placement and was interviewed in Aug 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
Methods to prevent corrosion of railway tracks include regular inspection, painting, cathodic protection, and using corrosion-resistant materials.
Regular inspection of tracks to identify and address corrosion early
Painting the tracks with corrosion-resistant coatings
Applying cathodic protection to prevent corrosion
Using corrosion-resistant materials in track construction
Implementing proper drainage systems to prevent w
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Relocation to a new area
Company downsizing or restructuring
Conflict with management or colleagues
I can join within 2 weeks of receiving a formal offer.
I will need to provide a notice period to my current employer.
I may need time to relocate if the job is in a different city.
I will need to finalize any pending commitments before joining.
I can start the onboarding process as soon as possible to expedite the joining date.
I appeared for an interview before Feb 2024.
based on 1 interview
Interview experience
Assistant Manager
18
salaries
| ₹6 L/yr - ₹9.5 L/yr |
Quality Officer
11
salaries
| ₹1.9 L/yr - ₹5 L/yr |
Maintenance Engineer
7
salaries
| ₹3.2 L/yr - ₹4 L/yr |
Shift Incharge
6
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Assistant Operator
6
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Uflex
Huhtamaki
Manjushree Technopack
Hindusthan National Glass