i
Columbia Petro Chem
Filter interviews by
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.
posted on 11 Sep 2021
I applied via LinkedIn and was interviewed in Mar 2021. There were 4 interview rounds.
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
posted on 7 Apr 2024
I appeared for an interview in Sep 2016.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Graduated with a degree in Computer Science
Passionate about coding and problem-solving
Completed internships at tech companies
Participated in coding competitions
posted on 14 Mar 2020
I applied via Walk-in and was interviewed before Mar 2019. There were 5 interview rounds.
Finding length of characters in string array without using inbuilt methods.
Iterate through each string in the array and count the number of characters in each string using a loop.
Add the count of characters in each string to get the total length of characters in the array.
Function to convert hexadecimal to binary in any programming language.
Create a function that takes a hexadecimal string as input.
Convert the hexadecimal string to an integer using the language's built-in function.
Convert the integer to binary using the language's built-in function.
Return the binary string.
posted on 1 Sep 2022
I applied via Company Website and was interviewed in Jul 2022. There were 3 interview rounds.
Manpower management involves proper allocation and utilization of resources, documentation ensures accountability, and safety measures are crucial for a secure work environment.
Create a detailed manpower plan outlining roles, responsibilities, and tasks for each team member.
Regularly assess workload and adjust manpower allocation as needed to ensure efficiency.
Implement a documentation system to track progress, identif...
posted on 9 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
The main reason for belt joint failure is usually due to improper installation or maintenance.
Improper installation of the belt joint, such as incorrect alignment or tensioning
Lack of proper maintenance, leading to wear and tear of the joint
Use of low-quality materials for the joint
Excessive load or stress on the belt joint
Environmental factors like temperature or humidity affecting the joint
The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.
Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.
It is typically expressed in terms of a percentage or a specific measurement unit.
For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.
Exceeding the alignment maximum tolerance can lead to per
To replace the bucket wheel reclaimer luffing cylinder, follow these steps.
1. Shut down the machine and ensure all power sources are disconnected.
2. Remove any surrounding components that may obstruct access to the luffing cylinder.
3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.
4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.
5...
JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.
JSA is task-specific, focusing on individual job tasks and potential hazards
HIRA is broader, looking at overall workplace hazards and assessing risks
JSA involves breaking down a job into steps and identifying potential hazards for each step
HIRA involv...
To create a PR in SAP, you can use transaction code ME51N or ME21N.
Use transaction code ME51N to create a purchase requisition in SAP.
Enter the necessary details such as material, quantity, delivery date, etc.
Save the purchase requisition and it will be created in the system.
Alternatively, you can also use transaction code ME21N to create a purchase order directly.
The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.
Identify the faulty pulley by checking for any signs of wear or damage.
Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.
Install the new pulley by aligning it properly and securing it in place.
Test the system to ensure the new pulley is fu...
PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.
PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.
Before starting work, a permit must be obtained from a designated authority.
The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken...
Assistant Manager
24
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Executive Production
13
salaries
| ₹3.9 L/yr - ₹6.5 L/yr |
Accountant
10
salaries
| ₹2.2 L/yr - ₹6.7 L/yr |
Logistics Manager
10
salaries
| ₹5.6 L/yr - ₹12.2 L/yr |
HR Manager
9
salaries
| ₹5 L/yr - ₹8 L/yr |
Sterling Oil Exploration & Energy Production
Kuwait National Petroleum Company
NTPC GE Power Services
Arabian Industries