Upload Button Icon Add office photos

Filter interviews by

China State Construction Engineering Corporation MEP Coordinator Interview Questions and Answers

Updated 8 Nov 2024

China State Construction Engineering Corporation MEP Coordinator Interview Experiences

1 interview found

MEP Coordinator Interview Questions & Answers

user image IRFAN UMAR SHAIKH

posted on 8 Nov 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How to design Ff system?
  • Ans. 

    Designing an Ff system involves determining the layout, sizing components, selecting materials, and ensuring proper functionality.

    • Understand the requirements and constraints of the project

    • Create a detailed layout plan including the location of components such as fire pumps, sprinklers, and alarms

    • Size components appropriately based on the area to be covered and fire protection needs

    • Select materials that meet safety stan...

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Offers low salary ask you to accept
  • Q2. Technical questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic questions and scenario based questions
Round 3 - One-on-one 

(1 Question)

  • Q1. About previous job experiences and personality test
Round 4 - One-on-one 

(1 Question)

  • Q1. Basic HR questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well technically and Diplomatic answers for all the questions will not work.
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Project Management
  • Q2. Project Building project
  • Q3. Project power project

I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions related to my work only. Like I mm interested in Tunnel, so question is from tunnel only.
  • Q2. Questions my CV also.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be bold be silent.
Just calm.
All well.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself
Round 3 - HR 

(1 Question)

  • Q1. Why are you joining this organization

Interview Preparation Tips

Interview preparation tips for other job seekers - Be transparent

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Some basic questions about Ofc work and personal information
  • Q2. Ofc cable blowing how to start
  • Ans. 

    To start OFC cable blowing, follow these steps

    • Ensure that the ducts are clean and free of any obstruction

    • Attach the cable blowing machine to the duct

    • Connect the cable to the machine and start the blowing process

    • Monitor the cable's progress and adjust the machine's speed as needed

    • Once the cable has been blown through the entire length of the duct, detach the machine and cable

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bondada Engineering Site Engineer interview:
  • Nld
  • Lm
Interview preparation tips for other job seekers - No fear in answering questions be strong
Just one interview it's enough to get job in bepl
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Explain about yourself
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Normal question related to your branch
  • Q2. About mass transfer,Heat transfer
Round 3 - Interview 

(1 Question)

  • Q1. About my goals and projects

Interview Preparation Tips

Topics to prepare for Saint-Gobain Deputy Manager interview:
  • Mass Transfer
  • Heat Exchangers
  • Fluid Mechanics

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How we define daviation of line and spotting of towers, major statuary clerance and their proposal and clearance proposals
  • Ans. 

    Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.

    • Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.

    • Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.

    • Major statutory clearance refers to the minimum distance required between power lines an...

  • Answered by AI
  • Q2. Where is your strengths of transmission line construction activity and why?
  • Ans. 

    My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.

    • Experience in managing large-scale transmission line construction projects

    • Expertise in ensuring adherence to safety standards and regulations

    • Ability to coordinate with cross-functional teams and stakeholders

    • Strong problem-solving and decision-making skills

    • Familiarity w...

  • Answered by AI
  • Q3. Why are you left your current employer

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask what you, dont give incomplete answer

China State Construction Engineering Corporation Interview FAQs

How many rounds are there in China State Construction Engineering Corporation MEP Coordinator interview?
China State Construction Engineering Corporation interview process usually has 1 rounds. The most common rounds in the China State Construction Engineering Corporation interview process are Technical.

Tell us how to improve this page.

China State Construction Engineering Corporation MEP Coordinator Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Saint-Gobain Interview Questions
4.0
 • 174 Interviews
R.V.R. PROJECTS Interview Questions
4.0
 • 28 Interviews
Gem Engserv Interview Questions
4.0
 • 23 Interviews
View all
Civil Site Engineer
28 salaries
unlock blur

₹3 L/yr - ₹7.6 L/yr

Site Engineer
18 salaries
unlock blur

₹4 L/yr - ₹7.2 L/yr

Quality Engineer
17 salaries
unlock blur

₹3.9 L/yr - ₹7.2 L/yr

Civil Engineer
13 salaries
unlock blur

₹3.5 L/yr - ₹8.6 L/yr

Safety Officer
12 salaries
unlock blur

₹2.2 L/yr - ₹5.9 L/yr

Explore more salaries
Compare China State Construction Engineering Corporation with

Saint-Gobain

4.0
Compare

Lea Associates South Asia

4.3
Compare

R.V.R. PROJECTS

4.0
Compare

ABCI Infrastructures

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview