Q1. What is the size of the concrete cube, the size of the slump cone, and the percentage of strength obtained for 3,7,14, and 28 days of a concrete cube?
The size of the concrete cube is typically 150x150x150 mm, the size of the slump cone is 100 mm, and the percentage of strength obtained varies for different curing periods.
Concrete cube size: 150x150x150 mm
Slump cone size: 100 mm
Percentage of strength obtained varies for 3, 7, 14, and 28 days
Example: Strength obtained at 28 days is typically around 90-95% of the design strength
Q2. Tests Done On Concrete, Soil, Different Materials etc
Tests are conducted on concrete, soil, and other materials to ensure quality and durability.
Various tests are conducted on concrete to check compressive strength, workability, and durability.
Soil tests are done to determine its composition, moisture content, and bearing capacity.
Different materials like steel, asphalt, and aggregates are tested for their properties and quality.
Non-destructive testing methods like ultrasonic testing and radiography are also used to assess mate...read more
Q3. Process Of Construction From Starting to End?
Construction process involves planning, designing, procurement, construction, and completion of a project.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating blueprints, obtaining permits, and selecting materials.
Procurement phase involves purchasing materials, hiring contractors, and scheduling deliveries.
Construction phase includes site preparation, foundation work, framing, and finishing.
Completion phase inv...read more
Q4. No of sample cubes for concrete for 100m^3
The number of sample cubes for concrete for 100m^3 depends on the specifications and requirements of the project.
Number of sample cubes typically ranges from 3 to 6 for 100m^3 of concrete.
The number of sample cubes may also depend on the strength grade of the concrete being tested.
It is important to follow relevant standards and guidelines for sampling and testing concrete.
Consulting with a structural engineer or testing laboratory can help determine the appropriate number of...read more
Q5. Plastering Procedure?
Plastering is a construction procedure used to cover walls and ceilings with a smooth finish.
Prepare the surface by cleaning and dampening it
Apply a base coat of plaster using a trowel
Allow the base coat to dry before applying a finish coat
Smooth and level the finish coat with a float or trowel
Finish by sanding and painting if necessary
Q6. Block Work Procedure?
Block work procedure involves laying bricks or blocks in a specific pattern to create walls or structures.
Prepare the surface by cleaning and leveling it
Mix mortar according to specifications
Lay the first course of blocks ensuring they are level and plumb
Continue laying subsequent courses, staggering joints for strength
Use a spirit level and string lines for accuracy
Fill joints with mortar and strike off excess
Allow mortar to cure before continuing
Inspect work for quality and...read more
Q7. Waterproofing Procedure?
Waterproofing procedure involves applying materials to prevent water from penetrating a structure.
Inspect the area to identify any existing leaks or damage
Prepare the surface by cleaning and repairing any cracks or holes
Apply waterproofing materials such as membranes, coatings, or sealants
Ensure proper curing and drying time before exposing to water
Test the waterproofing by conducting a water test to check for leaks
Q8. False Ceiling Procedure?
False ceiling procedure involves installation of a secondary ceiling below the main ceiling to improve aesthetics, acoustics, and insulation.
Measure the area of the room to determine the amount of materials needed
Prepare the ceiling by cleaning and ensuring it is structurally sound
Install the framework for the false ceiling using metal channels or wooden battens
Attach the ceiling tiles or panels to the framework
Finish the edges with trim or molding for a polished look
Test the...read more
Q9. Tile Work Procedure?
Tile work procedure involves preparation, layout, cutting, setting, grouting, and finishing.
Preparation of the surface by cleaning and leveling
Layout of tiles to ensure proper alignment and spacing
Cutting tiles to fit around edges and corners
Setting tiles using adhesive or mortar
Grouting to fill in gaps between tiles
Finishing by cleaning off excess grout and sealing the tiles