Round 1 - Technical 

(2 Questions)

  • Q1. What is cycle time of plc?
  • Ans. 

    Cycle time of a PLC refers to the time taken for the PLC to complete one full cycle of operation.

    • Cycle time is the time taken for the PLC to scan all inputs, execute the program logic, and update all outputs.

    • It is typically measured in milliseconds or microseconds.

    • A shorter cycle time allows for faster response to inputs and outputs.

    • Factors affecting cycle time include the complexity of the program, the speed of the pr...

  • Answered by AI
  • Q2. What is DB in siemens?
  • Ans. 

    DB in Siemens refers to a data block, which is a structured data type used for storing and organizing data in PLC programming.

    • DBs are used to store data in a structured format for easy access and manipulation

    • They can be used for storing input/output data, configuration parameters, and other variables

    • DBs can be accessed and modified by multiple program blocks within a PLC program

    • Example: DB1 could be used to store input

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are a automation engineer don’t join buhler as buhler automation solution is totally different from other industries. And our perior experience is zero here

Skills evaluated in this interview

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All aboutElectrical distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is purely based on electrical basics and they asked questions only from your resume please prepare your resume clearly
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Substation related questions
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Basic of Electrical engineering and presence of mind

Interview Preparation Tips

Topics to prepare for TÜV SÜD Project Engineer interview:
  • Electricals
  • Electronics

I applied via Campus Placement and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Mostly from fluid mechanics

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident while answering the questions

Interview Questionnaire 

3 Questions

  • Q1. What is the effect of temperature and irradiance on solar panels?
  • Ans. 

    Temperature and irradiance affect the performance and efficiency of solar panels.

    • High temperatures can decrease the efficiency of solar panels.

    • Increased irradiance levels can lead to higher power output.

    • Temperature coefficient determines the panel's performance at different temperatures.

    • Irradiance levels vary based on factors like time of day, weather conditions, and panel orientation.

    • Temperature and irradiance should

  • Answered by AI
  • Q2. What are co-generation plants? How do you link co-generation plants with solar Pv plants?
  • Ans. 

    Co-generation plants produce both electricity and heat. They can be linked with solar PV plants to increase energy efficiency.

    • Co-generation plants use a single fuel source to produce both electricity and heat

    • Solar PV plants generate electricity from sunlight

    • Linking co-generation plants with solar PV plants can increase overall energy efficiency

    • Excess heat from co-generation plants can be used to power solar thermal sys...

  • Answered by AI
  • Q3. They asked about my profile? what do you need?

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to work in TUV SUD corporate then you need to have some kind of references.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Communication between PLC controllers and DCS
  • Ans. 

    Communication between PLC controllers and DCS involves establishing a reliable connection for data exchange.

    • PLC controllers and DCS communicate through various communication protocols such as Modbus, Profibus, Ethernet/IP, etc.

    • Data is exchanged between PLC controllers and DCS for process control and monitoring.

    • Communication can be bidirectional, allowing both systems to send and receive data.

    • Proper configuration and pr...

  • Answered by AI
  • Q2. PID tunning and control
Round 2 - HR 

(2 Questions)

  • Q1. Why do you wanna join ABB
  • Q2. What make you chose abb over other companies

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and confidential

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Previous experience and project related technical questions.
  • Q2. Basic Electrical engineering questions from previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have a good understanding of your previous project
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Case Study 

What is the meaning of NPSH?

Interview Preparation Tips

Interview preparation tips for other job seekers - no
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(11 Questions)

  • Q1. Introduce yourself briefly?
  • Ans. 

    I am a highly skilled and experienced Project Engineer with a strong background in managing complex engineering projects.

    • Over 10 years of experience in project management and engineering

    • Proficient in utilizing project management software and tools

    • Strong leadership and communication skills

    • Proven track record of successfully delivering projects on time and within budget

    • Experience in coordinating with cross-functional tea...

  • Answered by AI
  • Q2. What projects you have done in previous company
  • Ans. 

    I have worked on various projects in my previous company, including the construction of a new office building and the implementation of a software system for project management.

    • Construction of a new office building

    • Implementation of a software system for project management

  • Answered by AI
  • Q3. What is lifecycle of project
  • Ans. 

    The lifecycle of a project refers to the stages it goes through from initiation to closure.

    • Initiation: project is defined and approved

    • Planning: project objectives, scope, and resources are determined

    • Execution: project plan is put into action

    • Monitoring and Control: project progress is tracked and necessary adjustments are made

    • Closure: project is completed and evaluated

    • Examples: construction of a building, development of...

  • Answered by AI
  • Q4. What are the industrial communication protocols
  • Ans. 

    Industrial communication protocols are standards for data exchange between devices in industrial automation and control systems.

    • Some common industrial communication protocols include Modbus, Profibus, DeviceNet, Ethernet/IP, and CANopen.

    • These protocols enable devices from different manufacturers to communicate with each other and exchange data.

    • Industrial communication protocols can be wired or wireless, and can operate...

  • Answered by AI
  • Q5. What are the settings required in MODBUS
  • Ans. 

    MODBUS settings include baud rate, parity, data bits, stop bits, and slave address.

    • Baud rate determines the speed of communication between devices.

    • Parity is used for error checking and can be set to even, odd, or none.

    • Data bits determine the number of bits used to represent each character.

    • Stop bits indicate the end of a character and can be set to 1 or 2.

    • Slave address is used to identify the device on the network.

    • Examp...

  • Answered by AI
  • Q6. Maximum speed in modbus
  • Ans. 

    The maximum speed in Modbus depends on the baud rate and cable length.

    • Modbus speed is measured in baud rate

    • Higher baud rates allow for faster data transfer

    • Cable length can also affect the maximum speed

    • For example, at 9600 baud rate, the maximum cable length is 1200 meters

  • Answered by AI
  • Q7. How many device add in modbus
  • Ans. 

    The number of devices that can be added in Modbus depends on the network architecture and the number of available addresses.

    • The maximum number of devices that can be added to a Modbus network is 247.

    • The number of available addresses depends on the type of Modbus protocol used (RTU or TCP/IP).

    • The network architecture also plays a role in determining the number of devices that can be added.

    • It is important to ensure that ...

  • Answered by AI
  • Q8. Types of modbus communication
  • Ans. 

    Modbus communication types include RTU, ASCII, and TCP/IP.

    • RTU (Remote Terminal Unit) is a serial communication protocol that uses binary code to transmit data.

    • ASCII (American Standard Code for Information Interchange) is a serial communication protocol that uses ASCII characters to transmit data.

    • TCP/IP (Transmission Control Protocol/Internet Protocol) is a network communication protocol that uses Ethernet to transmit d...

  • Answered by AI
  • Q9. On which scada you are worked
  • Ans. 

    I have worked on multiple SCADA systems including Wonderware, Ignition, and Inductive Automation.

    • I have experience with configuring and programming SCADA systems

    • I have worked with Wonderware, Ignition, and Inductive Automation

    • I am familiar with creating HMI screens, alarms, and trends

    • I have experience with PLC communication and data acquisition

    • I have worked on projects in various industries including manufacturing and

  • Answered by AI
  • Q10. What is maximum Input output handle
  • Ans. 

    The maximum input output handle refers to the maximum number of inputs and outputs that a device can handle.

    • The maximum input output handle varies depending on the device and its specifications.

    • It is important to consider the maximum input output handle when selecting a device for a project.

    • For example, a PLC may have a maximum input output handle of 256 inputs and 256 outputs.

    • Another example is a microcontroller with ...

  • Answered by AI
  • Q11. How many pages designed in HMI
  • Ans. 

    The number of pages designed in HMI depends on the project requirements and complexity.

    • The number of pages can range from a few to hundreds depending on the project scope.

    • The complexity of the HMI design and functionality also affects the number of pages.

    • Factors such as user interface, data visualization, and system integration can impact the number of pages.

    • It is important to prioritize user experience and ease of nav

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Currently they having vacancy for project engineer who is having experience of process automation in oil and gas field,chemical.

Skills evaluated in this interview

Buhler Interview FAQs

How many rounds are there in Buhler PLC Programmer interview for experienced candidates?
Buhler interview process for experienced candidates usually has 1 rounds. The most common rounds in the Buhler interview process for experienced candidates are Technical.
What are the top questions asked in Buhler PLC Programmer interview for experienced candidates?

Some of the top questions asked at the Buhler PLC Programmer interview for experienced candidates -

  1. What is cycle time of p...read more
  2. What is DB in sieme...read more

Tell us how to improve this page.

Buhler PLC Programmer Interview Process for Experienced

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 242 Interviews
John Deere Interview Questions
4.1
 • 236 Interviews
Cummins Interview Questions
4.3
 • 235 Interviews
Caterpillar Inc Interview Questions
4.2
 • 178 Interviews
Hitachi Interview Questions
4.0
 • 82 Interviews
TÜV SÜD Interview Questions
3.9
 • 65 Interviews
Timken Interview Questions
4.0
 • 48 Interviews
Alfa Laval Interview Questions
3.9
 • 31 Interviews
View all

Buhler PLC Programmer Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

1.0

Work-life balance

3.0

Salary

3.0

Job security

1.0

Company culture

2.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Team Lead
64 salaries
unlock blur

₹6.2 L/yr - ₹21 L/yr

Service Engineer
56 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Senior Engineer
44 salaries
unlock blur

₹4.5 L/yr - ₹15.1 L/yr

Design Engineer
38 salaries
unlock blur

₹2.7 L/yr - ₹8 L/yr

Assistant Engineer
38 salaries
unlock blur

₹2.4 L/yr - ₹8.2 L/yr

Explore more salaries
Compare Buhler with

John Deere

4.1
Compare

Cummins

4.3
Compare

ABB

4.1
Compare

Caterpillar Inc

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview