I applied via Recruitment Consultant and was interviewed in Jun 2020. There were 5 interview rounds.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Dec 2018. There were 3 interview rounds.
PPAP submission is the final phase of APQP.
PPAP submission is the final step in the APQP process.
It involves submitting a Production Part Approval Process (PPAP) to the customer.
PPAP includes documentation and samples that demonstrate the product meets customer requirements.
PPAP submission is necessary before production can begin.
PPAP submission is a critical step in ensuring product quality and customer satisfaction.
APQP consists of five phases, with PPAP being submitted in the fourth phase.
APQP stands for Advanced Product Quality Planning.
The five phases of APQP are: Planning and Program Definition, Product Design and Development, Process Design and Development, Product and Process Validation, and Launch, Feedback, Assessment, and Corrective Action.
PPAP stands for Production Part Approval Process.
PPAP is submitted in the fourth p...
To make a PPT, use a software like PowerPoint or Google Slides and follow a structure with clear and concise content.
Choose a template or create your own design
Add relevant and visually appealing images
Use bullet points and short sentences
Practice your presentation before presenting
Include a conclusion and call to action
Process audit involves reviewing and evaluating a company's procedures and policies to ensure they are effective and efficient.
Identify the process to be audited
Define the audit objectives and scope
Select the audit team and assign roles
Gather and analyze data
Identify areas for improvement
Develop and implement corrective actions
Monitor and follow up on corrective actions
Document the audit findings and recommendations
When a customer complaint arises, I listen attentively, empathize with their concerns, investigate the issue, propose a solution, and follow up to ensure satisfaction.
Listen attentively to the customer's complaint
Empathize with their concerns and show understanding
Investigate the issue by gathering relevant information
Propose a solution or offer alternatives to address the complaint
Follow up with the customer to ensure
Can you please clarify the question?
I'm sorry, I don't understand what you're asking.
Could you please rephrase the question?
I need more information to answer that question.
Gauges and fixtures should be developed during the design phase of NPD to ensure quality and efficiency.
Identify critical dimensions and tolerances early on
Develop gauges and fixtures to measure and verify these dimensions
Test and refine gauges and fixtures throughout the design process
Ensure gauges and fixtures are compatible with manufacturing processes
Finalize gauges and fixtures before production begins
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Nov 2018. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Bus off is a state where a node on a bus is disabled due to errors. I2C and SPI are different communication protocols used in electronics.
Bus off is a state in CAN bus where a node is disabled due to errors.
I2C (Inter-Integrated Circuit) is a synchronous serial communication protocol commonly used for communication between integrated circuits.
SPI (Serial Peripheral Interface) is another synchronous serial communication...
based on 4 reviews
Rating in categories
Senior Engineer
54
salaries
| ₹3.9 L/yr - ₹15 L/yr |
Technical Lead
50
salaries
| ₹9 L/yr - ₹22 L/yr |
Design Engineer
46
salaries
| ₹3 L/yr - ₹9.1 L/yr |
Assistant Manager
39
salaries
| ₹7.8 L/yr - ₹25 L/yr |
Senior Design Engineer
29
salaries
| ₹5.5 L/yr - ₹13.5 L/yr |
ZF Steering Gear
Knorr-Bremse
Ag Industries
Gestamp