i
Filter interviews by
Be the first one to contribute and help others!
posted on 9 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
The main reason for belt joint failure is usually due to improper installation or maintenance.
Improper installation of the belt joint, such as incorrect alignment or tensioning
Lack of proper maintenance, leading to wear and tear of the joint
Use of low-quality materials for the joint
Excessive load or stress on the belt joint
Environmental factors like temperature or humidity affecting the joint
The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.
Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.
It is typically expressed in terms of a percentage or a specific measurement unit.
For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.
Exceeding the alignment maximum tolerance can lead to per
To replace the bucket wheel reclaimer luffing cylinder, follow these steps.
1. Shut down the machine and ensure all power sources are disconnected.
2. Remove any surrounding components that may obstruct access to the luffing cylinder.
3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.
4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.
5...
JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.
JSA is task-specific, focusing on individual job tasks and potential hazards
HIRA is broader, looking at overall workplace hazards and assessing risks
JSA involves breaking down a job into steps and identifying potential hazards for each step
HIRA involv...
To create a PR in SAP, you can use transaction code ME51N or ME21N.
Use transaction code ME51N to create a purchase requisition in SAP.
Enter the necessary details such as material, quantity, delivery date, etc.
Save the purchase requisition and it will be created in the system.
Alternatively, you can also use transaction code ME21N to create a purchase order directly.
The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.
Identify the faulty pulley by checking for any signs of wear or damage.
Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.
Install the new pulley by aligning it properly and securing it in place.
Test the system to ensure the new pulley is fu...
PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.
PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.
Before starting work, a permit must be obtained from a designated authority.
The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken...
posted on 22 Dec 2024
posted on 16 Aug 2024
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
PE 80 and P100 are different types of polyethylene pipes used in plumbing and construction.
PE 80 is a type of polyethylene pipe with a minimum required strength (MRS) of 8 MPa, while P100 has an MRS of 10 MPa.
PE 80 is commonly used for low-pressure applications such as irrigation and drainage, while P100 is used for high-pressure applications like gas distribution.
PE 80 pipes are typically blue in color, while P100 pip...
Associate gas is a gas that is in equilibrium with the liquid phase, while non-associate gas is not in equilibrium with the liquid phase.
Associate gas molecules are attracted to each other and tend to form a liquid phase at lower temperatures and higher pressures.
Non-associate gas molecules do not have strong intermolecular forces and remain in the gas phase even at low temperatures and pressures.
Examples of associate ...
MDPE (Medium Density Polyethylene) laying process involves preparing the trench, laying the pipe, and backfilling with suitable material.
Prepare the trench to the required depth and width
Lay the MDPE pipe carefully to avoid damage
Connect the pipes using appropriate fittings and joints
Backfill the trench with suitable material to provide support and protection to the pipe
Compact the backfill material to prevent settling
posted on 9 Aug 2024
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Monthly and 6 month target fixed
White Oil , Transformer Oil and Petroleum jelly grade wise discussion.
The monthly sales target is set based on historical data, market trends, and company goals.
Monthly sales target should be realistic and achievable
Consider factors such as seasonality, market demand, and competition
Set stretch goals to motivate the sales team
Regularly review and adjust the target based on performance
Example: Monthly sales target is $100,000 based on previous year's performance and 10% growth target
I applied via Approached by Company and was interviewed in May 2024. There were 5 interview rounds.
Verbal Reasoning, Numerical ability, General Knowledge, English Proficiency.
I will bring a combination of practical experience and theoretical knowledge from my previous work and education.
Practical experience in implementing engineering solutions
Theoretical knowledge gained from education in engineering principles
Ability to troubleshoot and problem solve based on past experiences
Strong communication skills to collaborate with team members and stakeholders
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
Implemented and executed test plans, conducted inspections, and ensured quality standards were met in last job as QA QC Engineer.
Developed test plans and procedures for various projects
Conducted inspections and audits to ensure compliance with quality standards
Identified and resolved quality issues through root cause analysis
Collaborated with cross-functional teams to improve quality processes
Utilized testing tools and
posted on 12 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
Rotating equipment parameters refer to the various factors that affect the performance and operation of rotating machinery.
Key parameters include speed, torque, power, vibration levels, temperature, and lubrication.
Proper monitoring and maintenance of these parameters are essential for ensuring optimal performance and preventing breakdowns.
Examples of rotating equipment include pumps, compressors, turbines, and motors.
...
I applied via Referral and was interviewed before Jan 2024. There were 3 interview rounds.
Moderate aptitude questions.
String-based questions and DMA-based questions.
HSE audit is a systematic evaluation of an organization's health, safety, and environmental management systems.
HSE audit assesses compliance with legal requirements and industry standards.
It identifies potential hazards, risks, and areas for improvement.
The audit process involves reviewing documentation, conducting inspections, and interviewing personnel.
Examples of HSE audit include assessing a construction site's saf...
based on 18 reviews
Rating in categories
Executive Accountant
6
salaries
| ₹1 L/yr - ₹2.6 L/yr |
Sales Engineer
5
salaries
| ₹4.8 L/yr - ₹4.8 L/yr |
Audit Manager
3
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Area Sales Manager
3
salaries
| ₹6 L/yr - ₹6.6 L/yr |
Head Administration and HR
3
salaries
| ₹7 L/yr - ₹9.6 L/yr |
Reliance Industries
Indian Oil Corporation
Bharat Petroleum
Hindustan Petroleum