i
Blue Star
Filter interviews by
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
HVAC systems are used for heating, ventilation, and air conditioning in buildings to maintain indoor air quality and comfort.
HVAC systems are used in residential, commercial, and industrial buildings.
They help regulate temperature, humidity, and air quality.
Examples of HVAC applications include central heating and cooling systems, rooftop units, and split systems.
Top trending discussions
posted on 14 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
SMT IPQC SMT testing stands for Surface Mount Technology In-Process Quality Control SMT testing.
SMT IPQC SMT testing is a quality control process used in the manufacturing of electronic circuit boards.
It involves testing the components and connections during the surface mount technology (SMT) assembly process.
The purpose is to ensure the quality and reliability of the circuit boards before they are fully assembled.
Test...
SMT stands for Surface Mount Technology.
SMT is a method of electronic component assembly where the components are mounted directly onto the surface of a printed circuit board (PCB).
It is a widely used technology in the electronics industry for its efficiency and compactness.
SMT allows for smaller and lighter electronic devices compared to through-hole technology.
Examples of SMT components include resistors, capacitors,
I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.
I applied via Naukri.com
I should contribute because I have the skills, knowledge, and passion to make a positive impact in the role of a Service Engineer.
I have the technical expertise and experience to troubleshoot and resolve complex issues.
I am a quick learner and can adapt to new technologies and systems.
I am a team player and can collaborate effectively with colleagues and customers.
I am dedicated to providing excellent customer service ...
I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.
Electronic components are parts that make up electronic circuits, such as resistors, capacitors, transistors, and diodes.
Resistors: control the flow of electric current
Capacitors: store and release electrical energy
Transistors: amplify or switch electronic signals
Diodes: allow current to flow in one direction only
I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.
Process parameters are defined variables that affect the outcome of a process. They are significant in ensuring consistency and quality.
Process parameters are variables that can be measured or controlled during a process
They can include factors such as temperature, pressure, time, and flow rate
By defining and monitoring process parameters, engineers can ensure consistency and quality in the final product
For example, in...
I applied via Referral and was interviewed in Dec 2021. There were 6 interview rounds.
There is a online test conducted related to General Reasoning and General English .Also one other test Related to textile technical question.
I am a Service Engineer with expertise in troubleshooting and repairing various types of equipment.
I have a Bachelor's degree in Mechanical Engineering.
I have 5 years of experience in the field, working for a leading manufacturing company.
I am skilled in diagnosing and resolving technical issues with machinery and equipment.
I have a strong understanding of electrical and mechanical systems.
I am proficient in using diag...
I would like a competitive salary that reflects my skills and experience.
I am looking for a salary that is commensurate with the responsibilities and requirements of the Service Engineer role.
I have researched the average salary range for Service Engineers in this industry and location.
I am open to negotiation and would like to discuss the salary package in more detail during the interview.
I value fair compensation for
The number of pole 1km cabling required depends on the specific project requirements and design considerations.
The number of pole 1km cabling needed will depend on the distance to be covered and the spacing between poles.
Factors such as terrain, existing infrastructure, and local regulations will also impact the number of poles required.
For example, in a straight road with no obstacles, fewer poles may be needed compar...
The size of the pole base plate depends on the load requirements and soil conditions.
The size of the pole base plate should be determined by the structural engineer based on the load requirements of the pole.
The soil conditions at the site also play a crucial role in determining the size of the base plate.
Factors such as wind load, seismic activity, and the weight of the pole itself should be considered when determinin
Stay plate dimensions are typically specified by the engineer or designer based on the specific requirements of the structure.
Stay plate dimensions are determined based on the load and stress requirements of the structure.
The dimensions of stay plates can vary depending on the material used and the design specifications.
Stay plates are often designed to distribute loads and provide stability in structures such as bridg
Typically 1-3 months notice period is required before joining a new job.
Notice period is the time between accepting a job offer and starting the new job.
It allows the current employer time to find a replacement and for the employee to wrap up their work.
Notice periods can vary depending on company policy and the level of the position.
It is common for notice periods to be 1-3 months in duration.
Some companies may requir...
I applied via Approached by Company and was interviewed in Jun 2024. There were 5 interview rounds.
Sub cooling and superheat are terms used in refrigeration to describe the temperature difference between the refrigerant's actual temperature and its saturation temperature.
Sub cooling is the difference between the refrigerant's actual temperature and its saturation temperature at a particular pressure.
Superheat is the difference between the refrigerant's actual temperature and its saturation temperature at a particula...
E6 error in a split unit can be resolved by checking the air filter, cleaning the coils, and resetting the unit.
Check the air filter for any blockages or dirt buildup
Clean the coils to ensure proper airflow and cooling
Reset the unit by turning it off for a few minutes and then turning it back on
Consult the user manual for specific troubleshooting steps
Manager and technical officer
One split AC installation work explain
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
780
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
320
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
252
salaries
| ₹0 L/yr - ₹0 L/yr |
AC Technician
197
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
163
salaries
| ₹0 L/yr - ₹0 L/yr |
Voltas
Godrej Appliances
Whirlpool
LG Electronics