Filter interviews by
Be the first one to contribute and help others!
posted on 11 Oct 2021
I was interviewed before Oct 2020.
posted on 21 Mar 2023
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Instrumentation related basics
I applied via Job Portal and was interviewed in Dec 2022. There were 2 interview rounds.
Identify code and output for getting enough message from log file to report.
Use log levels to filter messages
Set up log rotation to avoid large files
Use regular expressions to search for specific messages
Consider using a log analysis tool for more advanced reporting
I am a software engineer tester with experience in handling electronic devices and troubleshooting. I am familiar with the organization and have the ability to handle customer scenarios.
Experience in handling electronic devices from installation to troubleshooting
Familiar with the organization and its functionality
Ability to handle customer scenarios
Knowledge of software testing methodologies and tools
posted on 9 Jun 2022
I applied via LinkedIn and was interviewed in May 2022. There was 1 interview round.
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Limit state method considers the ultimate load capacity of the structure while working stress method considers the permissible stress limit.
Limit state method is a modern approach while working stress method is an older approach.
Limit state method considers the safety of the structure against ultimate failure while working stress method considers the safety of the structure against yielding.
Limit state method uses part...
Cracked concrete refers to concrete that has developed cracks due to various reasons.
Cracks in concrete can be caused by shrinkage, settlement, or overload.
Cracks can also be caused by temperature changes, chemical reactions, or poor construction practices.
Cracked concrete can lead to structural problems and should be repaired as soon as possible.
Repair methods for cracked concrete include epoxy injection, concrete ove...
India has four seismic zones based on the intensity of earthquakes and their frequency.
India is divided into four seismic zones - Zone 2, 3, 4, and 5
Zone 5 is the most seismically active region, while Zone 2 is the least active
The seismic zones are based on the intensity of earthquakes and their frequency
The zones help in designing earthquake-resistant structures and disaster management plans
Specifications are provided by structural consultants to contractors to ensure that the construction meets the required standards.
Structural consultants provide detailed specifications for the construction project.
These specifications include information on materials, dimensions, and quality standards.
Contractors use these specifications to ensure that the construction meets the required standards.
The specifications al...
Developers and PMCs have significant influence on a project's outcome and site development.
Developers can influence the design and functionality of the site through their expertise and experience.
PMCs can influence the project's timeline, budget, and quality through their management and oversight.
Both can influence the site's overall success by ensuring proper planning, communication, and execution.
For example, a devel...
I prefer not to disclose my current CTC. As for my expected salary, it would depend on the job responsibilities and market standards.
I am not comfortable sharing my current CTC as it is confidential information.
My expected salary would be based on the job responsibilities, company culture, and market standards.
I am open to negotiation and would like to discuss the compensation package in detail.
I am more interested in ...
I applied via Walk-in and was interviewed in Jan 2022. There were 4 interview rounds.
The paper contained Safety ,Technical and electrical questions
posted on 11 Jan 2022
I applied via Campus Placement and was interviewed in Dec 2021. There was 1 interview round.
Explanation of polymorphism, function overloading/overriding, virtual function, and friend function.
Polymorphism is the ability of an object to take on many forms.
Function overloading is having multiple functions with the same name but different parameters.
Function overriding is having a derived class provide its own implementation of a method that is already provided by its parent class.
Virtual functions are functions...
I solve problems on site by identifying the root cause and implementing effective solutions.
I analyze the problem thoroughly to understand its underlying causes.
I collaborate with the team to gather relevant information and perspectives.
I prioritize the critical errors based on their impact and urgency.
I develop and implement action plans to address the identified issues.
I monitor the progress of the solutions and make...
Managing site and local vendors in a project involves effective communication, coordination, and relationship building.
Establish clear expectations and requirements with vendors
Regularly communicate project updates and progress to vendors
Coordinate vendor activities to ensure they align with project timelines
Monitor vendor performance and address any issues promptly
Build strong relationships with vendors based on trust...
Managing site progress involves monitoring and tracking the project's timeline and milestones.
Create a detailed project schedule with clear deadlines and milestones
Regularly review and update the schedule to ensure progress is on track
Communicate with the project team to identify any potential delays or issues
Implement strategies to mitigate risks and address any obstacles
Monitor the actual progress against the planned...
based on 9 reviews
Rating in categories
Graduate Apprentice Trainee
4
salaries
| ₹0.7 L/yr - ₹3.4 L/yr |
Design Engineer
3
salaries
| ₹3 L/yr - ₹8 L/yr |
Accountant
3
salaries
| ₹3.2 L/yr - ₹5.2 L/yr |
John Deere
Cummins
Tractors and Farm Equipment
KONE