i
Bharat FIH
Filter interviews by
posted on 28 Jan 2021
I applied via Walk-in and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Apr 2020. There were 5 interview rounds.
posted on 17 Jan 2021
I applied via National apprenticeship training scheme(NATS)) and was interviewed before Jan 2020. There was 1 interview round.
Mobile communication involves several processes including transmission, reception, modulation, and demodulation.
Mobile communication uses radio waves to transmit and receive signals.
The signals are modulated to carry information such as voice, data, and video.
The modulated signals are then transmitted through the air to a nearby base station.
The base station receives the signals and demodulates them to extract the info...
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
posted on 23 Mar 2022
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
Shortcut keys in computer
I applied via Campus Placement and was interviewed before Oct 2021. There were 4 interview rounds.
Basic Btech and quantitative aptitude question
GD topic was general , but advice is that all should be eager to participate.
posted on 19 Sep 2021
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
My strengths include attention to detail, strong organizational skills, and the ability to work efficiently under pressure.
Attention to detail
Strong organizational skills
Ability to work efficiently under pressure
I applied via Naukri.com and was interviewed before Sep 2019. There was 1 interview round.
5S quality is a workplace organization method that aims to improve efficiency and safety.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and maintain the workplace
Standardize - establish procedures and standards for maintaining the workplace
Sustain - ensure that the 5S system is continuously implemented and improved
Example: organ...
The 7 tools in production are used for quality control and process improvement.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Flowcharts
Cause-and-effect diagrams
Product inspection involves thorough examination of the product to ensure it meets quality standards.
Identify the specific quality standards for the product
Inspect the product visually for defects or irregularities
Use measuring tools to check dimensions and tolerances
Perform functional tests to ensure the product works as intended
Document any issues found and report to appropriate personnel
The root cause of product A's failure in the last stage can be due to various factors.
The failure could be due to a problem in the manufacturing process.
It could be due to a defect in the raw materials used.
The failure could also be due to a design flaw in the product.
Human error during the production process could also be a cause.
Environmental factors such as temperature or humidity could also play a role.
Junior Engineer
1k
salaries
| ₹1.2 L/yr - ₹4.7 L/yr |
Associate Engineer
514
salaries
| ₹2 L/yr - ₹6 L/yr |
Engineer
153
salaries
| ₹2.9 L/yr - ₹7.8 L/yr |
Production Engineer
103
salaries
| ₹1.8 L/yr - ₹5.6 L/yr |
Senior Engineer
101
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Bharat Electronics
Flex
Foxconn
Dixon Technologies