Filter interviews by
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
I am an engineer with a strong background in mechanical engineering and a passion for problem-solving.
Mechanical engineer with expertise in designing and analyzing mechanical systems
Proficient in CAD software such as AutoCAD and SolidWorks
Experience in conducting tests and experiments to evaluate product performance
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
Completed a pro...
I want to change my current company to explore new opportunities and challenges.
Seeking career growth and advancement
Looking for a more challenging and stimulating work environment
Interested in working with new technologies or industries
Desire for better work-life balance or company culture
Wishing to relocate to a different city or country
Top trending discussions
Nitrogen gas is used in accumulators due to its inert properties and ability to maintain pressure for extended periods of time.
Nitrogen gas is inert, meaning it does not react with other substances, making it ideal for maintaining pressure without causing corrosion or contamination.
It is also non-flammable, which reduces the risk of fire hazards in accumulator systems.
Nitrogen gas has a stable temperature range, allowi...
Accumulator is used in WTG to store excess energy generated by the wind turbine for later use.
Accumulator helps in smoothing out the power output from the wind turbine.
It allows for energy storage when the demand is low and release of stored energy when the demand is high.
Accumulators can also help in providing backup power during periods of low wind.
Examples of accumulators used in WTG include batteries, flywheels, an
To improve Performance Ratio, focus on optimizing system efficiency, reducing losses, and maximizing output.
Optimize system design and operation to increase efficiency
Reduce losses through better maintenance and monitoring
Maximize output by utilizing advanced technologies and techniques
Capacity utilization factor is a measure of how much of a system's capacity is being utilized.
Capacity utilization factor is calculated by dividing the actual output by the maximum possible output.
It is often expressed as a percentage.
A high capacity utilization factor indicates efficient use of resources, while a low factor may suggest underutilization or inefficiency.
For example, if a factory has a maximum output of ...
GHI stands for Gross Heating Input, GTI stands for Gross Thermal Efficiency, and GPR stands for Gross Production Rate.
GHI is a measure of the total heat input to a system or appliance.
GTI is a measure of the efficiency of converting input energy into useful output energy.
GPR is a measure of the rate at which a system or appliance produces a certain output.
Improving plant PR involves enhancing communication, community engagement, and sustainability efforts.
Enhance communication with stakeholders through regular updates and transparent information sharing.
Engage with the local community through events, workshops, and outreach programs to build positive relationships.
Implement sustainable practices and showcase environmental initiatives to improve public perception.
Utilize...
I applied via campus placement at Delhi College of Engineering (DCE), Delhi and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Oct 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
To troubleshoot inverters, SCBs, transformers, and breakers, follow these pointers:
Check for loose connections and wiring
Inspect for physical damage or wear and tear
Use a multimeter to test voltage and current
Check for proper grounding
Refer to manufacturer's manual for specific troubleshooting steps
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
Overhauling procedure of turbine and generator involves disassembly, inspection, repair, and reassembly.
Disassemble turbine and generator components
Inspect components for wear and damage
Repair or replace damaged components
Reassemble components and test for proper function
based on 2 interviews
Interview experience
based on 14 reviews
Rating in categories
Engineer
38
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Assistant Engineer
32
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Senior Engineer
28
salaries
| ₹4 L/yr - ₹7.3 L/yr |
Assistant Manager
21
salaries
| ₹6 L/yr - ₹9.4 L/yr |
Electrical Engineer
8
salaries
| ₹4 L/yr - ₹5.8 L/yr |
Cairn Energy
Oil India
Reliance Industries
GAIL