i
Ather Energy
Filter interviews by
Ather Energy is an Indian electric vehicle manufacturer known for its smart electric scooters.
Ather Energy was founded in 2013 by Tarun Mehta and Swapnil Jain.
Their flagship models include the Ather 450X and Ather 450 Plus.
Ather Energy is focused on developing electric vehicles with advanced technology and features.
The company has its own charging infrastructure called Ather Grid.
Ather Energy has received funding from ...
Top trending discussions
I applied via Campus Placement and was interviewed in Sep 2023. There were 2 interview rounds.
Before engine assembly, it is important to prepare all necessary components and tools.
Ensure all engine components are clean and free of debris
Check all parts for damage or wear and replace if necessary
Organize all necessary tools and equipment for assembly
Follow manufacturer's guidelines and torque specifications
Perform a final inspection before starting the assembly process
posted on 22 Apr 2022
Mistake proofing and error proofing are synonymous terms used to describe the same concept.
Mistake proofing and error proofing aim to prevent errors or mistakes from occurring in a manufacturing process.
Both techniques involve implementing measures or systems to eliminate or minimize the possibility of errors.
The goal is to design processes or systems that are foolproof and do not rely solely on human vigilance.
Example...
posted on 9 Dec 2021
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
posted on 2 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
ECA, ECP, and PCW are abbreviations related to manufacturing engineering.
ECA stands for Engineering Change Authorization, which is a formal process to document and approve changes to a product or process.
ECP stands for Engineering Change Proposal, which is a formal document that outlines proposed changes to a product or process.
PCW stands for Process Change Worksheet, which is a document used to record and track change...
posted on 10 Nov 2020
I applied via Newspaper Ad and was interviewed before Nov 2019. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Sep 2023. There were 2 interview rounds.
Before engine assembly, it is important to prepare all necessary components and tools.
Ensure all engine components are clean and free of debris
Check all parts for damage or wear and replace if necessary
Organize all necessary tools and equipment for assembly
Follow manufacturer's guidelines and torque specifications
Perform a final inspection before starting the assembly process
posted on 22 Apr 2022
Mistake proofing and error proofing are synonymous terms used to describe the same concept.
Mistake proofing and error proofing aim to prevent errors or mistakes from occurring in a manufacturing process.
Both techniques involve implementing measures or systems to eliminate or minimize the possibility of errors.
The goal is to design processes or systems that are foolproof and do not rely solely on human vigilance.
Example...
posted on 9 Dec 2021
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
posted on 30 Dec 2024
I applied via Naukri.com and was interviewed in Nov 2024. There were 6 interview rounds.
Group decision is very well my decision
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Associate Manager
122
salaries
| ₹6.5 L/yr - ₹25 L/yr |
Manager
64
salaries
| ₹11.6 L/yr - ₹28.2 L/yr |
Program Manager
63
salaries
| ₹10.8 L/yr - ₹28 L/yr |
Area Sales Manager
62
salaries
| ₹12 L/yr - ₹29 L/yr |
Senior Manager
62
salaries
| ₹16 L/yr - ₹42 L/yr |
Ola Electric Mobility
Ultraviolette Automotive
Tork Motors
EMFLUX MOTORS