Filter interviews by
The process for preparing a stock statement involves gathering information on current inventory levels, valuing the stock, and documenting it in a report.
Gather information on current inventory levels of all items in stock.
Assign a value to each item based on its cost or market price.
Calculate the total value of the stock by summing up the values of all items.
Document the stock levels and values in a stock statement re...
A store procedure is a set of SQL statements that can be stored in the database and executed as a single unit.
Store procedures can be used to perform complex operations on the database.
They can improve performance by reducing network traffic and increasing security.
Store procedures can be reused and shared among multiple applications.
Examples include procedures for updating inventory levels, calculating sales totals, o
There are 5 members in my team including myself.
There are a total of 5 members in the team
This includes myself as the Store Officer
The team consists of 4 other members who assist in store operations
Top trending discussions
posted on 29 Jun 2022
I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Dec 2021. There was 1 interview round.
I can handle inventory efficiently by implementing proper tracking systems and conducting regular audits.
Implementing a barcode system for easy tracking
Conducting regular physical inventory counts
Analyzing sales data to forecast demand
Maintaining accurate records of all inventory transactions
Ensuring proper storage and handling of inventory
Collaborating with other departments to optimize inventory levels
posted on 15 Apr 2023
Good working best opportunity better' experience
Methods for measuring and testing various construction materials
Sand aggregate can be measured by weight or volume
Steel can be measured by weight or length
MS plate can be measured by thickness and size
Wood materials can be measured by length, width, and thickness
Quality tests for bulk materials can include strength, durability, and moisture content
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
posted on 30 Nov 2022
To maintain a store, proper organization and inventory management are essential. Materials can be received through various methods such as purchase orders, deliveries, or transfers.
Implement a systematic inventory management system
Ensure proper organization and labeling of items
Regularly conduct stock checks and audits
Establish clear procedures for receiving materials
Verify the quantity and quality of received material...
Most should be group discussion because it's we take a lot of solutions.
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
To maintain a store, it is important to organize inventory, implement proper storage techniques, conduct regular stock checks, and ensure cleanliness.
Organize inventory by categorizing items and using proper labeling
Implement proper storage techniques such as using shelves, racks, and bins
Conduct regular stock checks to track inventory levels and identify any discrepancies
Ensure cleanliness by regularly cleaning the st...
posted on 8 Jul 2024
Conduits and wiring are the electrical materials used before wall plastering.
Conduits are pipes or tubes used to protect and route electrical wiring before plastering.
Wiring refers to the electrical cables that will be hidden behind the plastered walls.
These materials are essential for safely and securely installing electrical systems in buildings.
CP fittings for a bathroom include faucets, shower heads, towel racks, and soap dishes.
Faucets are essential for sinks and showers
Shower heads provide water for bathing
Towel racks are used to hang towels
Soap dishes hold soap for washing hands
CP fittings are typically made of chrome-plated brass for durability
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Quantity Surveyor
5
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Bridge Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Project Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group