Filter interviews by
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
Scaffolding hot work
I applied via Approached by Company and was interviewed before Sep 2022. There were 11 interview rounds.
Aptitude Test: This is often one of the initial stages. It assesses a candidate's basic cognitive abilities, problem-solving skills, and logical reasoning.
Coding Test: For technical roles, a coding test is common. Candidates are given programming challenges to assess their coding skills, algorithmic thinking, and problem-solving abilities.
Group Discussion (GD): This stage may be used to evaluate communication skills, teamwork, and the ability to articulate thoughts. It's often used for roles that require collaboration and communication
Assignment: Some companies provide candidates with a specific task or assignment related to the job. This can be a practical demonstration of the candidate's skills and approach to real-world tasks.
Case Study: Similar to an assignment but often focused on problem-solving or decision-making. Case studies assess a candidate's ability to analyze information, make informed choices, and present a logical solution.
I was interviewed in May 2024.
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I applied via Naukri.com and was interviewed before Aug 2020. There were 3 interview rounds.
The CO gas limit is the maximum allowable concentration of carbon monoxide in the air.
The CO gas limit is set by regulatory agencies to protect human health and safety.
The limit varies depending on the location and type of facility.
For example, the Occupational Safety and Health Administration (OSHA) has set a permissible exposure limit (PEL) of 50 parts per million (ppm) for an 8-hour workday.
In residential homes, the...
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
I was interviewed in Jul 2024.
I have strong technical skills in various software programs and systems, including Microsoft Office Suite, project management tools, and data analysis software.
Proficient in Microsoft Office Suite (Word, Excel, PowerPoint, Outlook)
Experience with project management tools such as Asana and Trello
Skilled in data analysis software like Tableau and SPSS
I have 8 years of experience in a supervisory role in the manufacturing industry.
8 years of supervisory experience in manufacturing
Managed a team of 15 employees
Implemented new processes to improve efficiency
Trained new employees on safety protocols
based on 3 reviews
Rating in categories
Inspection Engineer
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
NDT Inspector
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Inspection Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
SGS
Bureau Veritas
Intertek
TÜV NORD