The project execution process involves several stages from feasibility study to commissioning.
Feasibility study: Assessing the technical and economic viability of the project.
Design and planning: Developing detailed electrical designs and creating a project plan.
Procurement: Procuring necessary equipment and materials.
Construction: Executing the electrical installation according to the design.
Testing and commissioning:...
Top trending discussions
I applied via Recruitment Consulltant
Rotten egg on inverted pen, social media
Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, and relays.
Perform regular maintenance on high and low voltage breakers, motors, and transformers.
Test and calibrate various protection relays for motors, transformers, and generators.
Conduct transformer oil BDV test, thermal scanning, and earth fault and prediction tests.
Terminate high voltage motors, instal...
Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, and relays.
Perform regular maintenance tasks on high and low voltage breakers, motors, and transformers.
Test and calibrate protection relays for motors, transformers, and generators.
Conduct transformer oil BDV tests, thermal scanning, and earth fault and prediction tests.
Terminate high voltage motors, install...
Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, switches, relays, and testing/calibration of protections.
Preventive maintenance of H.V & LV breakers, motors, transformers, switches, etc.
Corrective maintenance of HV/MV/LV switchgears, breakers, cubicles, etc.
Testing and calibration of various protection relays for motors, transformers, generators.
Transforme...
posted on 30 Sep 2022
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.
posted on 11 Jan 2023
I applied via Approached by Company and was interviewed before Jan 2022. There were 2 interview rounds.
posted on 22 Aug 2021
I was interviewed before Aug 2020.
based on 1 review
Rating in categories
Project Designer
20
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Senior Engineer
12
salaries
| ₹8.4 L/yr - ₹20.8 L/yr |
Process Engineer
12
salaries
| ₹5 L/yr - ₹11.3 L/yr |
Piping Engineer
11
salaries
| ₹6.5 L/yr - ₹10.2 L/yr |
Instrument Engineer
10
salaries
| ₹6.5 L/yr - ₹14.6 L/yr |
Jacobs Engineering Group
Fluor Corporation
Wood Group
AECOM