Q1. Binding wire required to bind 1MT steel if the diameter of bar ranges between 20 mm to 32 mm?
Approximately 10 kg of binding wire is required to bind 1MT of steel bars ranging from 20 mm to 32 mm in diameter.
Approximately 10 kg of binding wire is needed for 1MT of steel bars with diameters between 20 mm to 32 mm.
The amount of binding wire required may vary slightly based on the specific dimensions and spacing of the bars.
It is important to ensure proper binding to maintain structural integrity and safety.
Q2. What's the formula of Ld ?
Ld is the formula for calculating the development length of reinforcement bars in concrete structures.
Ld = 1.3 * φ * db * fy / σs
Ld = development length
φ = reduction factor for tension bars
db = diameter of the bar
fy = yield strength of the bar
σs = permissible stress in the steel
Q3. Different Anchorage length and development length
Anchorage length is the length of the embedded portion of a reinforcement bar, while development length is the length required for full bond strength.
Anchorage length is determined by the type of structure and the forces it will experience.
Development length is calculated based on the diameter of the reinforcement bar and the strength of the concrete.
Anchorage length is typically longer than development length to ensure proper bond strength.
Examples: In a beam-column joint, t...read more
Q4. Maximum and minimum reinforcement of column
Maximum and minimum reinforcement of column
The maximum reinforcement in a column is typically limited to 4% of the cross-sectional area of the column
The minimum reinforcement in a column is usually around 0.8% to 1.0% of the cross-sectional area
Reinforcement in columns is provided to resist bending and shear forces
Q5. What is the formula of coding North or East
The formula for coding North or East is based on the concept of coordinates and cardinal directions.
The formula for coding North is +1 in latitude
The formula for coding East is +1 in longitude
Coordinates are typically represented using latitude and longitude values
For example, if the current coordinates are (40.7128° N, 74.0060° W), the coded North coordinates would be (41.7128° N, 74.0060° W)
Similarly, the coded East coordinates would be (40.7128° N, 75.0060° W)
Q6. What is the formula for level 🎚️ Transfusion
The formula for level 🎚️ Transfusion is the calculation used to determine the amount of blood or blood products to be transfused to a patient.
The formula takes into account the patient's weight, hemoglobin level, and desired hemoglobin level.
It is typically calculated using the following formula: Transfusion volume (in mL) = (Desired Hb - Current Hb) x Blood volume (in mL) / Hb concentration (in g/dL)
For example, if a patient's current hemoglobin level is 10 g/dL and the desir...read more
Q7. Coverage of Shuttering Oil?
Shuttering oil is used to coat formwork before pouring concrete to prevent it from sticking to the formwork.
Shuttering oil is applied to formwork to create a barrier between the formwork and the concrete.
It helps in easy removal of formwork after the concrete has set.
Proper coverage of shuttering oil ensures smooth and clean concrete surfaces.
Common types of shuttering oils include mineral oil-based, vegetable oil-based, and synthetic oils.
Coverage should be uniform and suffi...read more
Q8. What is full form of rtgs
RTGS stands for Real Time Gross Settlement
RTGS is a system of electronic fund transfer between banks in real-time
It is used for high-value transactions that require immediate clearing and settlement
The minimum amount for RTGS transactions is usually set by the bank
RTGS is faster and more secure than NEFT (National Electronic Funds Transfer)
Example: If you want to transfer Rs. 10 lakhs from your account to another account, you can use RTGS
Interview Process at Antalya
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month