Upload Button Icon Add office photos

Filter interviews by

Al-Darwish Engineering WLL Hvac Technician Interview Questions and Answers

Updated 5 Jan 2022

Al-Darwish Engineering WLL Hvac Technician Interview Experiences

1 interview found

I applied via Referral and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is your nature of work,your skilled of the types of Ac,refrigeration cycle,gases types,common HVAC complaints, solutions...

Interview Preparation Tips

Interview preparation tips for other job seekers - Never give up ,do or die that's it,take it easy on interview, because I'm first time interview got for gulf that time I don't have passport alsoo because I'm thinked job gets OK or failed that's make good experience... OK thank you share my memories...

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(10 Questions)

  • Q1. Cleaning line clearance
  • Q2. Rh temperature and Batch packing records filled completed
  • Q3. BQS MACHINE OPERATING primary packing
  • Q4. Type A and type B CLEANING
  • Q5. Area and equipment clearance
  • Q6. Min time machine settings
  • Ans. 

    The minimum time machine settings depend on the specific machine and its capabilities.

    • The minimum time machine settings will vary depending on the machine's capabilities and intended use.

    • Some time machines may have a minimum setting of just a few seconds, while others may require a minimum of several minutes or even hours.

    • It is important to consult the machine's manual or manufacturer for specific information on minimu...

  • Answered by AI
  • Q7. Min.time batch complete
  • Q8. Good documents precatis
  • Q9. Standard operating procedure
  • Ans. 

    Standard operating procedure is a set of step-by-step instructions to carry out routine tasks in a consistent and safe manner.

    • SOPs ensure consistency and quality in work

    • They help in reducing errors and risks

    • SOPs should be regularly reviewed and updated

    • Examples of SOPs include safety procedures, equipment operation, and maintenance tasks

  • Answered by AI
  • Q10. BQS MACHINE OPERATING and acg camera settings
  • Ans. 

    BQS machine operating and ACG camera settings are important for efficient and accurate testing.

    • BQS machine is used for testing the quality of tablets and capsules.

    • ACG camera settings are used to capture images of the tablets and capsules for analysis.

    • Proper calibration and maintenance of the BQS machine is crucial for accurate results.

    • ACG camera settings should be adjusted based on the size and shape of the tablets or

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For me to learn and know new things and to move forward in my life and my groth

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Infosys Interview Questions
3.7
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
HDFC Bank Interview Questions
3.9
 • 2.1k Interviews
Bharti Airtel Interview Questions
4.0
 • 818 Interviews
Hetero Drugs Interview Questions
3.9
 • 195 Interviews
View all
HSE Officer
4 salaries
unlock blur

₹4.9 L/yr - ₹19 L/yr

QA QC Engineer
3 salaries
unlock blur

₹12 L/yr - ₹24 L/yr

Explore more salaries
Compare Al-Darwish Engineering WLL with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

Reliance Industries

4.0
Compare

Infosys

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview