Manufacturing a welding electrode involves mixing raw materials, forming the electrode, baking it, and packaging.
Raw materials such as metal powders, binders, and fluxes are mixed together in specific proportions.
The mixture is then formed into the desired electrode shape through extrusion or pressing.
The formed electrodes are baked in ovens at high temperatures to remove moisture and bind the ingredients together.
Afte...
6013 and 7018 are classification numbers for welding electrodes indicating their specific characteristics.
6013 is a general-purpose electrode suitable for welding in all positions with a smooth arc and minimal spatter.
7018 is a low-hydrogen electrode used for welding in all positions with high-quality welds and strong mechanical properties.
The water flow rate in the wire drawing box is 500 liters per minute.
The water flow rate in the wire drawing box is 500 liters per minute.
It is important to maintain this flow rate for optimal performance.
Regular monitoring and adjustment may be necessary to ensure consistent flow.
Examples: 500 liters per minute, 10 gallons per minute, etc.
The per metric ton die consumption in wire drawing depends on factors such as wire diameter, material type, lubrication, and machine efficiency.
Die consumption can vary based on the wire diameter being drawn.
Different materials may require different die consumption rates.
The type and effectiveness of lubrication used can impact die consumption.
Machine efficiency and maintenance can also affect die consumption.
For examp...
The power consumption associated with binding wire depends on the type of wire and the equipment used.
Power consumption can vary based on the thickness and material of the binding wire.
The power consumption may also depend on the efficiency of the equipment used for binding.
For example, using a thicker and stronger binding wire may require more power compared to a thinner wire.
Using automated binding equipment may cons
The manpower costing for welding electrodes per ton is dependent on various factors.
Manpower costing for welding electrodes per ton can vary based on the type of electrodes used (e.g. stick electrodes, flux-cored electrodes)
The skill level and experience of the welders using the electrodes can also impact the manpower costing
Other factors such as overhead costs, efficiency of the welding process, and labor rates in the...
Discuss the ISO 9001:2015 standard.
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
I was interviewed before May 2021.
Basic engineering questions
I applied via Newspaper Ad and was interviewed in Apr 2023. There were 3 interview rounds.
Our current work structure is a matrix organization with cross-functional teams.
We have multiple departments and teams working together on projects
Each project has a project manager and a cross-functional team
We have regular meetings to ensure alignment and progress
We encourage collaboration and communication across departments
We have a clear hierarchy and reporting structure
Yes, I can draw a 2D drawing of a connecting rod in CAD software.
I would start by opening the CAD software and selecting the appropriate tools for drawing lines, arcs, and circles.
Then, I would use the dimensions and specifications provided to create an accurate representation of the connecting rod.
I would also ensure that the drawing is to scale and includes all necessary details such as material type and finish.
Examp...
Seeking new challenges and growth opportunities.
Looking for a more challenging role to utilize my skills and experience.
Desire to work in a different industry or with a different product/service.
Seeking better work-life balance or company culture.
Limited opportunities for advancement or professional development in current organization.
Company restructuring or downsizing.
Personal reasons such as relocation or family obl
Yes, I do have a bike.
I have a road bike that I use for exercise and commuting.
I enjoy exploring new bike trails and routes in my free time.
I also participate in charity bike rides to raise money for various causes.
Yes, I am willing to relocate to Pune for the Senior Manager position.
I am excited about the opportunity to work in a new city and explore its culture.
I have researched the cost of living and housing options in Pune and am comfortable with the relocation.
I am committed to the success of the company and am willing to make the necessary sacrifices to ensure that success.
I have experience working remotely and can continue...
I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 6 interview rounds.
Scenarios based questions to answer in depth as prompt response.
Replied on interview after a year,
posted on 14 Sep 2024
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
posted on 4 May 2024
I applied via Company Website and was interviewed in Sep 2023. There was 1 interview round.
I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.
Steps for planning physical security of a premise and data center
Conduct a risk assessment to identify potential threats and vulnerabilities
Develop a security plan based on the assessment
Implement access controls, such as biometric scanners and security cameras
Ensure proper environmental controls, such as fire suppression systems and temperature monitoring
Train employees on security protocols and conduct regular drills
...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Manager
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra