Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old slue barring remove and new slue barring fix and nut tightening sure and blumber block top cover fix and nut bolt tightening sure and paper work cancelled and conveyor belt running ok